| 1 | Reconductoring with LT ABC |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 3 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 4 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 5 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 6 | Providing Stay for LT poles incl. digging & back filling pit. |
| 7 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 8 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 9 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 10 | Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint. |
| 11 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 12 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 13 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 14 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 15 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 16 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 17 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 18 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 19 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 20 | Dismantling 2 Line spacer from existing OH Line |
| 21 | Dismantling 3 line spacer on the existing LT OH line |
| 22 | Redoing single phase service connection including lowering down the guy wire portion repairing/changing WP wire and reconnecting the same including conveyance of material to site from section office at various |
| 23 | Redoing three phase service connection including lowering down the guy wire portion repairing/changing WP wire and reconnecting the same including conveyance of material to site from section office at various |
| 24 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 25 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 26 | Providing End Caps |
| 27 | Providing Cable Tie |
| 28 | Erection of suspension clamp for LT ABC of any size |
| 29 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 30 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 31 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 32 | Installation of Pre-insulated lugs for 70sqmm |
| 33 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 34 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 35 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections Please Enable Macros to View BoQ information |