| 1 | Erection Part of 11/0.4 KV, 100 KVA Transformer (T.S no /2025-26) |
| 2 | Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. (100 KVA Transformer) |
| 3 | Transportation and Loading of materials sub-station materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage. |
| 4 | Supply Part of 11/0.4 KV, 100 KVA Transformer 195/2024-25 |
| 5 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA |
| 6 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) Prov By HPSEBL 2nos |
| 7 | Prov. RCC Muff |
| 8 | Prov. concrete filling in RCC muff |
| 9 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line |
| 10 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA. |
| 11 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 12 | Transformer Belting & Knee Bracing |
| 13 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed] |
| 14 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer] |
| 15 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 16 | Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 17 | Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing) |
| 18 | Transformer L.T Distribution Box and GO Switch fixing Assembly |
| 19 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos |
| 20 | Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No. |
| 21 | Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm |
| 22 | Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type |
| 23 | Prov. D.O Fuse Unit |
| 24 | Prov. Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 25 | Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm |
| 26 | Prov. Stay set complete |
| 27 | Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) |
| 28 | Prov. Pipe Earthing Set |
| 29 | Prov. 6 SWG GI wire For Earthing |
| 30 | Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 100 KVA DTR |
| 31 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 32 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 33 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 34 | Prov. Aluminium Thimble |
| 35 | Prov. Copper Thimble 200 Amp |
| 36 | Prov. Danger Plate |
| 37 | Prov. Barbed Wire |
| 38 | Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured |
| 39 | Prov. Aluminium Paint. |
| 40 | Prov. Red Oxide |
| 41 | Capacitors Bank 415 V, 36+ KVAr for 100 KVA |
| 42 | Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect. |
| 43 | Prov. and installion of Rev -FWD DG -EB Sync Panel ,58 kva DG set of Tata make & other allied accesories (4 nos earthing for DG &Panel , AI Cable for DG set to panel. Please Enable Macros to View BoQ information |