| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 2 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 3 | Construction of Embankment with Material obtained from Borrowpits (Lead 3 Km.) :-Construction of embankment with approved material obtained from borrow pits with all lifts and leads with 2 Km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 5 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 6 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 7 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 8 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 9 | Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 10 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M20 using batching plant & manual placing Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 11 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. (As per DSR- 13.80) Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. |
| 12 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade : New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) (As per DSR- 13.47.1) Including all material, labour, T&P, Taxes, Cess etc. complete as per direction of Engineer-in-charge but excluding GST. Please Enable Macros to View BoQ information |