Name of Work:- Construction of Foundation and Shifting of High Mast Pole at Various Place in M.C. Nilokheri.
Sl. No.
Item Description
1
[23.22.3.2]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 3.2. Supply and erection of sheet steel enclosures 1pole/2 pole/4 pole on wall/on existing pedestal complete as required. S.P.N. or DP enclosure suitable for DP MCB [Through Rate]
2
[24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. [Through Rate]
3
[24.1.2]EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. [Through Rate]
4
[24.1.7]EARTHING AND LIGHTENING ARRESTOR 7. Supplying and laying 25mm x 3 mm G.I. strip in 40 mm dia,GI pipe as/from earth electrode including soldering etc. as required. [Through Rate]
5
[24.13.16]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 16. 10 Sq mm 3 core (Arm.) [Through Rate]
6
[24.13.4]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 4. 4 Sq mm 3 core (Arm.) [Through Rate]
7
[24.4.9.1]STREET LIGHT 9.1. Erection of High mast ( Labour only) on existing CC foundation ( foundation to be paid separately and foundation bolt shall be provided) 12 to 15 metre High mast [Through Rate]
8
[24.5.2.2]MISCELLANEOUS ITEMS 2.2. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work. DWC/HDPE pipe 50/40 mm outer dia/ inner dia [Through Rate]
9
[24.8.7]RCC FOUNDATIONS FOR OCTAGONAL POLES 7. Providing RCC foundation of M25 grade (1 Cement:1 Stone aggregate: 2 Coarse sand) i/c excavation, steel reinforcement (Fe 500) @80 kg/cum of concrete contents, concrete cover 50mm, anchor bolts etc. over a bed of PCC 1:5:10 of required dimensions for octagonal poles of various heights as per following specifications complete in all respects and as per directions of Engineer-in-charge 9m high pole [Through Rate]
10
[24.9.1]RCC FOUNDATIONS FOR HIGH MAST OCTAGONAL POLES 1. Providing RCC foundation of M25 grade (1 Cement:1 Stone aggregate: 2 Coarse sand) i/c excavation, steel reinforcement (Fe 500) @ 75 kg/cum of concrete contents, concrete cover 50mm, anchor bolts etc. over a bed of PCC 1:5:10 of required dimensions for high mast octagonal poles of various heights as per following specifications complete in all respects and as per directions of Engineer-in-charge 12.5 m high mast pole [Through Rate] Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.