| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 2 | 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for : |
| 4 | Foundations, footings, bases for columns. |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 6 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level/above plinth level. |
| 10 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundation and plinth in: |
| 12 | Cement mortar 1:6 (1 cement : 6 Coarse sand) |
| 13 | 12 mm cement plaster of mix : |
| 14 | 1:6 (1 cement : 6 coarse sand) |
| 15 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 metres lead. |
| 16 | With cement mortar 1:4 (1 cement : 4 fine sand). |
| 17 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 18 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 19 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 20 | In cement mortar |
| 21 | Disposal of building rubbish/ malba/ similar unserviceable dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. Please Enable Macros to View BoQ information |
| 22 | Disposal of building rubbish/ malba/ similar unserviceable dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. Please Enable Macros to View BoQ information |