Renovation Work Using Sdbc On Km 1, 2, And 3 Of The Fatehpur–Dairiyakhal–Lansdowne Motor Road, Located In The Jahrikhal Development Block Of Pauri Garhwal District, Under The Annual Maintenance Head For The Year 2026–27., Lansdowne-Uttarakhand
TDR : 54738776
Tender Notice
BOQ
1 Days Left
Lansdowne
Uttarakhand
Renovation Work Using Sdbc On Km 1, 2, And 3 Of The Fatehpur–Dairiyakhal–Lansdowne Motor Road, Located In The Jahrikhal Development Block Of Pauri Garhwal District, Under The Annual Maintenance Head For The Year 2026–27.
Name of Work:- okZ 2026&27 esa okfkZd vuqj{k.k ds vUrxZr tuin ikSM+h x<+oky ds fo/kkulHkk {ks= ySUlMkSu esa Qrsgiqj ls ySUlMkSu eksVj ekxZ ds fdeh0 1]2 ,oa 3 esa ,l0Mh0ch0lh0 }kjk uohuhdj.k dk dk;ZA
Sl. No.
Item Description
1
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
2
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
3
Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction for GradingII (19 mm nominal size).
4
Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respect Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respect
5
Providing and laying of hot applied thermoplastic compound of ISI Mark ApproveD Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.