| 1 | Site Clerance including labour andmatrials and including grass cutting/Dressing and carrage of matrials by Head |
| 2 | E/W filling in embankment with cartagesoil up to 8.00 km distances etc com. |
| 3 | Dismenteling of Brick Work includingStacking of materials as directed bythe Engineer-in-Charge with thedistance of 60.00m. Work SI No. 692 |
| 4 | E/W in Excavation in ordenery soil infoudation including labour andmatrials and T/P with all com. WorkSI No. 251 |
| 5 | C.C. Work in 1:6:12 in cement, finesand and 40 mm Gauge Brick Ballastincluding labour and matrials , T/Pwith all com. Work SI No. 273 |
| 6 | M-150 B/W in 1:4 in cement and coarsand mortar including labour and matrials, T/P with all com. Work SI No.305 |
| 7 | 12mm thick Plaster work in 1:3 in cementand fine sand mortar including labour andmatrials, T/P with all com. Work SINo.583 |
| 8 | R.C.C. Work in 1:1.5:3 in cementcoarse sand and 20mm gaugeincluding labour and matrials , T/Pwith all com. Work SI No.285 |
| 9 | MS work in R.C.C. work includinglabour and matrials, T/P with all com.Work SI No.504 |
| 10 | Construction of Granular sub base (GSB)by providing coarse graded materialspreading in uniform layers with motorgrader on prepared surface, mixing by mixin place method with rotavator at OMC,and compacting with vibratory roller toachieve the desired density, complete asper Clause 401 .. |
| 11 | P /L of 80 mm thick rubber mouldednterlocking cement concrete Paverblocks,Work SI No. 786(I)DEDUCTED OLD BRICKS & BATS RS. 53122.00 |
| 12 | P/F Colour interlocking tiles with all comp. |
| 13 | P.C.C. Work in 1:2:4 in cement, Coarsesand and 20 mm GaugeStone gritincluding labour and matrials , T/Pwith all com. Work SI No. 279(B) |
| 14 | S/F of 0.60X45X0.08 mm stone patiyaincluded all comp work. |
| 15 | Shifting of all material ,add to item 251-253 for every additional 30m .lead or partof 30m.or for every additional 1.50m lift orpart of 1.50m .Work SI No-254.300 m distance |
| 16 | drain work with all comp.S/F of 15mm dia pipe for connection of |
| 17 | S/F of Granite Sign Board includinglabour and matrials T/P with all com.Work. |
| 18 | Add 18% GST Please Enable Macros to View BoQ information |