| 1 | Description of works |
| 2 | The sand should be and clean and free from dust, dirt and foreign matters. The dust of the sand should be less than as per the standard specification and sieved through 4.75 mm I.S sieve. The sand shall be brought from the river sand and uniform in the shape and well graded. The river sand consists of fine rounded grains. percentage deducted from volume of sand & not more than 5% of volume etc complete. As directed by work incharge. |
| 3 | Supply of 20mm metal not less than 20mm, stone obtained from approved quarry including supply site of work etc complete. As directed by work incharge. |
| 4 | Supply of Cement including of charges and stacking at work sire etc. complete. As directed by work incharge (Supply at the site whenever required) etc complete. As directed by work incharge. |
| 5 | The supply of the stainless steel 304 of the rods and rolled section of the various size i.e. I section of 100 x 50mm and 6mm thickness, C-Channel 100 x 50mm and 5mm thickness and angle of the size 50 x 50 x 6mm of the various size to supply at the site with the cutting of the required size etc. complete (Supply at the site whenever required) etc complete. As directed by work incharge. |
| 6 | The Supply of the Hilti chemical Araldite various adhesive required for the anchoring and fixing in the rod in the basalt stone at all material supply at site whenever required etc complete. As directed by work incharge. |
| 7 | The supply of the stainless steel 304 steel plate of the 6mm thickness and width of the 25mm at required to anchoring the rock surface, the bending of the edges and moulded as per the requirement the supply at the site wherever required etc complete. As directed by work incharge. |
| 8 | The provision made for the scaffolding of supports existing structure for the concreting with using the providing and fixing double scaffolding cup locks types on the exterior side of building / structure up to 25m height above ground level, including additional rows of scaffolding in stepped manner as per requirement of sites made with 40 mm dia M.S. tube placed 1.5m center to center horizontal & vertical tubes joints with cup & lock system with M.S. tubes, M.S. tube challis M.S. clamps and staircase system in the scaffolding for working platform etc and maintaining it is a serviceable condition for excavation of work of cleaning and or pointing and or applying chemical and removing it therefore. The scaffolding system shall be stiffened with bracings, runners , connection with the building etc whenever required if feasible for inspection of work at required location with essential safety features for the work man etc complete. As directed by work incharge. |
| 9 | Provision for purchase of too and plants required for execution of work. |
| 10 | PVC Ghamela etc complete. As directed by work incharge. |
| 11 | Bamboo of the 10 feet etc complete. As directed by work incharge. |
| 12 | Wooden Planks of Size 6' x 8\\" x 1.5'' etc complete. As directed by work incharge. |
| 13 | Coir String for construction work etc complete. As directed by work incharge. |
| 14 | Wooden Ballies of the 10 feet etc complete. As directed by work incharge. |
| 15 | PVC Water tank 1000 liter Sintex etc complete. As directed by work incharge. |
| 16 | PVC Pipe1\\" 90 feet etc complete. As directed by work incharge. |
| 17 | The provision for the cover the all side coverd with green net to the surrounding the area of Nandhi Mandpa etc complete. As directed by work incharge. |
| 18 | GST 18% of SL.No.1 to 16 Please Enable Macros to View BoQ information |