| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means including getting out and disposal of excavated earth lead and lift, disposing execess earth out of ACTREC premises complete as directed by Engineer-incharge. |
| 2 | Same as above in hard rock |
| 3 | SOLING: Providing & laying rubble stone soling using spotless stones below floors roads/pavements etc. mechanically / manually consolidated thickness as specified below with stones vertically handset interstices packed with smaller stone chips, binding with murrum & sprinkling water for proper consolidating and finishing to required levels in quantities as and when required etc. complete all as directed by the Engineer-in-Charge. |
| 4 | Providing and laying in position Ready Mix Concrete (RMC) M-25 design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but with centering, shuttering, finishing as per direction of the engineer-in-charge; |
| 5 | Providign & Placing Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding with cover blocks all complete . Thermo-Mechanically Treated bars of grade Fe-500D or more. Including lead & lift complete as directed and instructed. |
| 6 | Providign & Fabrication of Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete in grating as per design complete as directed and instructed. |
| 7 | Providing & Doing 12 mm thick cement plaster finished with a floating coat of neat cement of mix : 1:3 Fine sand over exisitng surface, curring complete as directed and instructed. |
| 8 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 9 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. |
| 10 | Providing and applying 2.5 mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. Please Enable Macros to View BoQ information |