| 1 | Item Description/ Heading |
| 2 | Installation of pump motor set ( 1500 GPM or above) on Bed plates, including fotto valves, Bends, short pieces, Non-return valves, sluice valves, Jetting hoses, suction and delivery pipe etc. |
| 3 | Dismantling of HT pump body cover and rotating unit and ditting of same after repairing |
| 4 | Laying of MS pipe including alignment surface leveling and supporting, surface leveling and supporting whenever required and jointing |
| 5 | M. S pipe 6\\" dia |
| 6 | M. S pipe 8\\" dia |
| 7 | M.S.Pipe 10\\" dia |
| 8 | M.S. Pipe 12\\" dia |
| 9 | Dismantling of M.S Pipe including cleanign around the joints, levelling the joints and separate the pipe and stacking a lead of 50 Mtr |
| 10 | M. S pipe 6\\" dia |
| 11 | M. S pipe 8\\" dia |
| 12 | M.S.Pipe 10\\" dia |
| 13 | M.S. Pipe 12\\" dia |
| 14 | Loading and Unloading of MS Pipe into 10 Te capacity Truck for all lead within the mine area ( with Flange) |
| 15 | M. S pipe 6\\" dia |
| 16 | M. S pipe 8\\" dia |
| 17 | M.S.Pipe 10\\" dia |
| 18 | M.S. Pipe 12\\" dia |
| 19 | Laying of HDPE pipe including Alignment, surface levelling and supporting wherever required |
| 20 | HDPE 180 mm |
| 21 | HDPE 200mm |
| 22 | HDPE 250mm |
| 23 | Dismantlsing of HDPE Pipe including cleaning around the joints, leveling to loosen the joint and separate the pipe and stacking within a lead of 50 mtr |
| 24 | HDPE 180 mm |
| 25 | HDPE 200mm |
| 26 | HDPE 250mm |
| 27 | Collection of MS pipe front R/Store to any other location including loading and unloading and stock for above 25 kms lead ( for Transportation departmental truck will be provided) |
| 28 | M. S pipe 6\\" dia |
| 29 | M. S pipe 8\\" dia |
| 30 | M.S.Pipe 10\\" dia |
| 31 | Shifting and installation of pontoon ( 60 Drums) |
| 32 | Analysis for collection of Belt and cutting and Gasket joints for pipe jointing |
| 33 | Cutting of Gasket 6\\" |
| 34 | Cutting of Gasket 6\\" |
| 35 | Cutting of Gasket 6\\" |
| 36 | Cutting of Gasket 6\\" |
| 37 | Loading, unloading, transporting fitting of suction and foot valve with Nuts and Bolts. Fitting of suction & foot valve for One Set |
| 38 | 6\\" dia |
| 39 | 8\\" dia |
| 40 | 10\\" dia |
| 41 | 12\\" dia |
| 42 | Dismantling, loading, unloading, transp[orting, stacking of suction & foot valve with Nut & Bolts. Dismantling of suction & foot valve with nut and bolts for One Set |
| 43 | 6\\" dia |
| 44 | 8\\" dia |
| 45 | 10\\" dia |
| 46 | 12\\" dia |
| 47 | Dismantling and shifting of pump motor set ( 1500 GPM and above) from Bed plates, including foot valves, Bends, short pieces, Non-Return valve, sluice valves, jetting hose, suction and delivery pipes. |
| 48 | Loading, unlading, transporting installation of Non-Return valve or sluice valve with Nuts and Bolts 4\\"/6\\" |
| 49 | Loading , unloading, transporting, installation of Non-Return Valve or sluice valve with nuts and bolts |
| 50 | 8\\"/10\\" |
| 51 | Dismantling, loading, unloading, transporting, stacking of Non-return valve with Nuts and Bolts or sluice valve with Nut and Bolt |
| 52 | 4\\"/6\\" |
| 53 | 8\\"/10\\" |
| 54 | Loaing, unloading, transporting fitting of Jetting hose (3 Mtr) with Nut and Bolts |
| 55 | Loading, unloading, transporting fitting of jetting hose (6 Mtr) with Nut and Bolts 6\\" |
| 56 | Making of HT pump/Motor set pontoon shed |
| 57 | Making of LT Pump/Motor set pontoon shed |
| 58 | Making of H.T. fencing |
| 59 | Making of L.T Fencing |
| 60 | Dismantling/Erection of HT/LT fencing /shed |
| 61 | Making of ladder pontoon fot maintenance and operation |
| 62 | Matching of 10\\"/8\\"/6\\" dia pipe line with another pipe line by gas cutting, welding etc. |
| 63 | Modification of Base plate for different motor and pump by gas cutting, welding and material fitting etc |
| 64 | Gas cutting like ( Angle, plate, bearing) heating of pump shaft and other miscellaneous work as and when required. |
| 65 | Making of 6\\" Tee/Bend |
| 66 | Making of 8\\" Tee/Bend |
| 67 | Making of 10\\" Tee/Bend |
| 68 | Making of 12\\" Bend |
| 69 | Making of 6\\" short piece |
| 70 | Making of 8\\" short piece |
| 71 | Making of 10\\" shoft piece |
| 72 | Making of 12\\" short piece |
| 73 | Reducer Making 12\\" - 10\\" |
| 74 | Reducer Making 10\\" - 8\\" |
| 75 | Reducer Making 8\\" - 6\\" |
| 76 | Welding of 6\\" dia MS flange (1000) |
| 77 | Welding of 8\\" dia MS flane (2500) |
| 78 | Weldig of 10\\" dia MS flange(30) |
| 79 | Shifting and installation of LT Pontoon ( 30 Drum |
| 80 | Making, shifting, and erectionof water tanker filling point |
| 81 | Providing MS nuts & bolts ( 5/8\\", 3/4\\" as per requirement |
| 82 | Dismantling, loading, unloading, transporting, stacking of jetting hose( 3 Mtr) with nuts and Bolts |
| 83 | 6\\" dia |
| 84 | 8\\" dia |
| 85 | 10\\" dia |
| 86 | Dismantling, loading, unloading transporting, stacking of 6\\" dia jetting hose ( 6 Mtr) with nut and bolt |
| 87 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |