|
| 1 | Single slope strong bamboo (3\\" to 4\\") frame work shed with Tarpaulin cover height 8'-6\\" to 9'-0\\" at the end and the post of strong bamboo (4\\"dia) @ 6'-0\\" C/C and embedded sufficiently in the ground supplied fited fixed with coir rope eith refits runners, ties, stiffeners and crossing etc, of full bamboos runner to be fixed with pillar or posts at protection of work Nylon/Coir rope and half split or full bamboo to be fixed on the roof of the shed to above the wind blow. The covering must sun/rain water tight, leakage of rain water will not be allowed in any circumstances. The ground to be labeled and dressed before starting the work, to be completed as per directions of the authority. |
| 2 | i) Without side covering for 3(Three) days. |
| 3 | ii) One side covering for 3(Three) days. |
| 4 | iii) Two side covering for 3(Three) days. |
| 5 | iv) Three sive covering for 3(Three) days. |
| 6 | v) Four side covering for 3(Three) days. |
| 7 | vi) Additional hiring charge for without side covering for 1(one) day |
| 8 | vii) Additional hiring charge for one side covering for 1(one) day |
| 9 | viii) Additional hiring charge for Two side covering for 1(one) day |
| 10 | ix) Additional hiring charge for Three side covering for 1(one) day |
| 11 | x) Additional hiring charge for Four side covering for 1(one) day |
| 12 | Double slope bamboo frame work shed including alternative UC bullah post ( 6\\")with Tarpaulin cover & other fittings same as item no. 1 above |
| 13 | i) Without side covering for 3(Three) days. |
| 14 | iv) Three sive covering for 3(Three) days. |
| 15 | vi) Additional hiring charge for without side covering for 1(one) day |
| 16 | ix) Additional hiring charge for Three side covering for 1(one) day |
| 17 | Flat roof shed covered with Hessian as will be required as per direction of the authority, fitting same as item no. 1. |
| 18 | i) Hessian Covering-3(Three) days. |
| 19 | ii) Additional hiring charge for 1(one) day for above mentioned item. |
| 20 | Tarpaulin/Hessian Sheet/Cloth partition strongly fixed on the bamboo frame (high 8'-0\\" to 9'-0\\") completed as per direction of the authority. |
| 21 | i) Tarpaulin Covering-3(Three) days. |
| 22 | ii) Hessian Covering-3(Three) days. |
| 23 | iii) Cloth (good quality)- 3(Three) days. |
| 24 | iv) Additional hiring charge for Tarpaulin covering for 1(one) day |
| 25 | v) Additional hiring charge for Hessian covering for 1(one) day |
| 26 | vi) Additional hiring charge for Cloth(good quality) covering for 1(one) day |
| 27 | Flat roof Pandel covered with coloured cloth as will be required as per direction of the authority, fitting same as item no. 1. |
| 28 | i) Without side covering for 3(Three) days. |
| 29 | iv) Three sive covering for 3(Three) days. |
| 30 | vi) Additional hiring charge for without side covering for 1(one) day |
| 31 | ix) Additional hiring charge for Three side covering for 1(one) day |
| 32 | Flat roof ceiling work covered with new coloured cloth as will be required as per direction of the authority including raping up coloured cloth cover bamboo post including all complete but excluding the supporting frame work. |
| 33 | i) For 3(Three) days |
| 34 | ii) Additional hiring charge for 1(one) day |
| 35 | Corrugated sheet partition strongly fixed on the floor(height 8' to 9') including frame work & complete as per direction of the authority. Fittings same as item no.1 |
| 36 | i) For 3(three) days |
| 37 | ii) Additional hiring charge for 1(one) day |
| 38 | Bamboo (4\\" dia) frame work inside the room for making partition with strong Bamboo posts (4\\"dia) 6'-0\\" apart and strongly fixed on the floor with runner etc. complete as per direction. Fittings same as item No.1 for three days |
| 39 | Bamboo (4\\" dia) fencing 1'-0\\" apart vertically in 3 rows supplied & fixed with strong bamboo posts where necessary within the pandel to construct where necessary as per direction. |
| 40 | i) For 3(three) days |
| 41 | ii) Additional hiring charge for 1(one) day |
| 42 | Barbed wire/Bamboo fencing 1'-0\\" apart vertically in 4 rows supplied & fixed with strong bamboo post(4\\"dia) @ 6'-0\\" apart and strongly embedded into the ground and to construct where necessary as per direction. |
| 43 | i)Barbed wire for 3(three) days |
| 44 | ii)Bamboo for 3(three) days |
| 45 | iii) Additional hiring charge for barbed wire for 1(one) day |
| 46 | iv) Additional hiring charge for bamboo for 1(one) day |
| 47 | Iron neting/Chicken mesh work to the windowa including supplying, fitting & fixing with 1\\"×1 batten for window complete & remove the same after completion of the election work. |
| 48 | i) For 1( One)days |
| 49 | ii) Additional hiring charge for 1(one) day |
| 50 | Iron neting/Chicken mesh work in sidef of the room, supplying, fitting & fixing all materials complete & remove the same after completion of the election work for Two days |
| 51 | Hard wood Z-batten work with 2'×2\\" pattern to doors & windows with necessary nail to seal the shutter complete & remove the same after completion of Election work (Materials are returnable after the fork. |
| 52 | i) For 1( One) days |
| 53 | ii) Additional hiring charge for 1(one) day |
| 54 | Corrugated/Plain sheet or 1\\" thick hard wood plank work to doors & window with 2'×2 batten & fitted with 'J' or 'U' hook to seal the shutter from insidef & out side complete & remove the same after completion of the election work. |
| 55 | i) Corrugated/Plain Sheet for 1( One) days |
| 56 | ii) 1\\" thick hard wood for 1( One) days |
| 57 | iii) Corrugated.Plain Sheet for additional hiring charge for 1(one)day |
| 58 | iv) 1\\" thick hard wood for additional hiring charge for 1(one)day |
| 59 | Corrugagted or plain sheet work with 1\\"thick hard wood plank work to door & window with 2'×2\\" hard wood batten, filled & fixed with 'J' or 'U' hook/Iron wear/nail/etc. seal the shutter from inside & outside complete & removed of the same after completion of work. |
| 60 | i) For 1( One) days |
| 61 | ii) Additional hiring charge for 1(one) day |
| 62 | Hiring charges of chairs for election work. The chairs are to be supplied at places mentioned above (Please specify type/quality of chair) |
| 63 | i) for one day |
| 64 | ii) for two days |
| 65 | iii) for three days |
| 66 | iv) for more than 3 days |
| 67 | Hiring charges of table of size 3'-6\\"×2'-6\\" for election work. The tables are to be supplied at places mentioned above (Please specify type/quality of chair) |
| 68 | i) for one day |
| 69 | ii) for two days |
| 70 | iii) for three days |
| 71 | iv) for more than 3 days |
| 72 | Hiring charges of table of size 3'-0\\"×3'-0\\" for election work. The tables are to be supplied at places mentioned above for one day. (Please specify type/quality of chair) |
| 73 | Hiring charges of good quality table cloth of size 6'-0\\"×4'0\\" for election work. The tables are to be supplied at places mentioned above for one day. |
| 74 | Hiring charges of good quality sofa set for election work. The sets are to be supplied at places mentioned above (Please supply photo) |
| 75 | i) for one day |
| 76 | ii) for two days |
| 77 | iii) for more than 2 days |
| 78 | Hiring charges of good quality centre table for election work. The tables are to be supplied at places mentioned above. (Please supply photo) |
| 79 | i) for one day |
| 80 | ii) for two days |
| 81 | iii) for more than 2 days |
| 82 | Supplying and placing dustbin for three days |
| 83 | Construction of drop gate with bamboo(4\\"dia) fitting fising complete & removed after completion of the election work for three days |
| 84 | Hire charges collapsible gate, supplying, fitting fixing complete including all charges. |
| 85 | i) for one day |
| 86 | ii) for two days |
| 87 | iii) for three days |
| 88 | iv) for more than 3 days |
| 89 | Supplying fitting fixing iron door ring |
| 90 | Hire charges of water drum(200ltr.) for one day |
| 91 | Hire charges of water drum(1000ltr.) for one day |
| 92 | Hire charges of wooden platform for cover drain complete for three day |
| 93 | Hire charges of GI/Ori-plust pipe of 12to25mm dia including fitting & fixing by necessary bends, bracket etc. and removing same after completion of the election work as per direction for three day |
| 94 | Hire charges of GI/ Plastic bib cock including fitting & fixing by necessary bends, bracket etc. and removing same after completion of the election work as per direction for three day |
| 95 | Erection & hiring charges of wooden Rack/Platform by wooden plank or ply wood work excluding supporting frame work as per direction. |
| 96 | i) for wooden rack |
| 97 | Erection & hiring charges of wooden Rack/Platform by wooden plank or ply wood work excluding supporting frame work as per direction. |
| 98 | i) for wooden rack / platform |
| 99 | Batten framing with cloth for screen board & other fitting |
| 100 | i) For two days |
| 101 | ii) For three days |
| 102 | iii) more than 3 days |
| 103 | Repairing of wooden door and window by Replacing the necessary ( Batten complete) |
| 104 | i) Wooden door and window repairing |
| 105 | Carpet for floor sitting |
| 106 | i) For one days |
| 107 | ii) For two days |
| 108 | iii) For three days |
| 109 | Polythene paper of satranchi for grass floor sitting |
| 110 | i) For one days |
| 111 | ii) For two days |
| 112 | iii) For more than two days |
| 113 | Making of wooden platform (6\\"' to 1' hight) and necessary frame work for grass floor sitting |
| 114 | i) For one days |
| 115 | ii) For two days |
| 116 | iii) for three days |
| 117 | iv) for more than three days |
| 118 | Good quality latrine pane and side wall hogla or black polythin covering with all fitting |
| 119 | Good quality uniral pane and side wall hogla or black polythin covering with all fitting |
| 120 | (5\\" inch.) Brick cement wall work for window and door sealing and removing same after completion of the election work as per direction |
| 121 | Hire charges of VIP Cushioned Chair, Supplying fitting fixing complete including all charges. |
| 122 | i) for one day |
| 123 | ii) for two days |
| 124 | iii) for more than 2 days |
| 125 | Hire charges of Carpet (Best Quality), Supplying, fitting, fixing complete including all charges for 3(Three) days |
| 126 | i) for three days |
| 127 | ii) for two days |
| 128 | iii) for more than 2 days |
| 129 | Hire charges of Steel Almirah of 7\\"-0\\" height, Supplying, fitting, fixing complete including all charges for one Month |
| 130 | Supplying fitting fixing of structure for Tower made of Eucalyptus bullah as vertical post and strong bamboo tie of size 10'×10' in base and at least 30' height as per approved design & direction including necessary hinge, nail etc and removing same after completion of the election work as per direction including hiring charges for one Month |
| 131 | Floor & rack Marking for storing of EVMs etc. in strong room with Ordinary paint (White) with 2” strit in grid pattern asper drawing attached with schedule and direction of authority |
| 132 | Painting block letters or digits with ordinary white paint of size 2”x2” on the floor and self at strong room asper drawing & direction ofauthority .Payment will be made on the no. of letter/digits written. |
| 133 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 500 m |
| 134 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. |
| 135 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish |
| 136 | Brick work with 1st class bricks in cement mortar (1:4) |
| 137 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortarincluding rounding off or chamfering corners as directed andraking out joints including throating, nosing and drip course,scaffolding/staging where necessary (Ground floor).[Excludingcost of chipping over concrete surface](ii) With 1:4 cement mortar 15 mm thick plaster |
| 138 | Supplying fitting fixing PVC flex in different size with printing etc. complete as per direction of authority. |
| 139 | Daily Labour wage (D.R.W.) will be required under infrastructure Cell. During Election Period at DC/RC campus |
| 140 | Providing on hire basis supply and installation temporary panel board (one no.) made from wooden plank board / angle iron frame comprising of the following switches including necessary inter connections and earthing attachment incl. Dismantling after the end of the programme.a) 500v, 200v, T.P.N. C/O Switch-01 No. b) 500V, 315A, T.P.N. B.B.C. with 4Nos. Al. Bar.- 01 Set c) 500V, 32A, T.P.N. Switches re-wireable type- 05 Nos. d) 55V.100A. T.P.N. main switch-01 No. e) 250V, 32A, D.P. switches re-wireable type- 12 Nos. f) Voltmeter (0-500) V.C.T. operated with selector switch. g) Ampere Meter (0-200) A, C.T. operated with selector switch. h) Indicating Lamp- 03 Nos. i) Danger Board j) Shock Treatment Chart |
| 141 | For Commissitioning works |
| 142 | Additional charges after 3 days |
| 143 | For DC RC |
| 144 | Additional charges after 3 days |
| 145 | For Compound Lighting |
| 146 | Additional charges after 3 days |
| 147 | For Parking purpose |
| 148 | Additional charges after 3 days |
| 149 | For Strong Room |
| 150 | Additional charges after 3 days |
| 151 | For Counting |
| 152 | Additional charges after 3 days |
| 153 | Providing on hire Main Wire with 1.1 KV. Gr. Al. Conductor P.V.C. /Ar. Cable of following sizes in laying. 4 core 95 sqmm P.V.C. Ar./Al. Cable |
| 154 | For DC RC |
| 155 | Additional charges after 3 days |
| 156 | For Parking purpose |
| 157 | Additional charges after 3 days |
| 158 | For Strong Room |
| 159 | Additional charges after 3 days |
| 160 | For Counting |
| 161 | Additional charges after 3 days |
| 162 | Providing on hire Main Wire with 1.1 KV. Gr. Al. Conductor P.V.C. /Ar. Cable of following sizes in laying. 4 core 50 sqmm. P.V.C. Ar./Al. Cable |
| 163 | For Strong Room |
| 164 | Additional charges after 3 days |
| 165 | Providing on hire Main Wire with 1.1 KV. Gr. Al. Conductor P.V.C. /Ar. Cable of following sizes in laying.4 core 25 sqmm. P.V.C. Ar./Al. Cable |
| 166 | For DC RC |
| 167 | Additional charges after 3 days |
| 168 | For Parking purpose |
| 169 | Additional charges after 3 days |
| 170 | For Strong Room |
| 171 | Additional charges after 3 days |
| 172 | For Counting |
| 173 | Additional charges after 3 days |
| 174 | Providing on hire Main Wire with 1.1 KV. Gr. Al. Conductor P.V.C. /Ar. Cable of following sizes in laying. 2 core 10 sqmm P.V.C. Ar./Al. Cable |
| 175 | For Commissitioning works |
| 176 | Additional charges after 3 days |
| 177 | For DC RC |
| 178 | Additional charges after 3 days |
| 179 | For Compound Lighting |
| 180 | Additional charges after 3 days |
| 181 | For Parking purpose |
| 182 | Additional charges after 3 days |
| 183 | For Strong Room |
| 184 | Additional charges after 3 days |
| 185 | For Counting |
| 186 | Additional charges after 3 days |
| 187 | S/Drawing on temporary basis 3x 1.5sqmm. core P.V.C. cu-wire on hire basis incl. dismt. The same. |
| 188 | For Commissitioning works |
| 189 | Additional charges after 3 days |
| 190 | For DC RC |
| 191 | Additional charges after 3 days |
| 192 | For Parking purpose |
| 193 | Additional charges after 3 days |
| 194 | For Strong Room |
| 195 | Additional charges after 3 days |
| 196 | For Counting |
| 197 | Additional charges after 3 days |
| 198 | Supply, providing and dismentalling on hire basis of the following electrical godgets. 500V, 32A/way, 4way TPN.B.D.B. (T.P.N.I.C.) |
| 199 | For Commissitioning works |
| 200 | Additional charges after 3 days |
| 201 | For DC RC |
| 202 | Additional charges after 3 days |
| 203 | For Compound Lighting |
| 204 | Additional charges after 3 days |
| 205 | For Parking purpose |
| 206 | Additional charges after 3 days |
| 207 | For Strong Room |
| 208 | Additional charges after 3 days |
| 209 | For Counting |
| 210 | Additional charges after 3 days |
| 211 | Supply, providing and dismentalling on hire basis of the following electrical godgets. 250V, 16A/way, 6way SPN B.D.B. (S.P.N.I.C.) |
| 212 | For Commissitioning works |
| 213 | Additional charges after 3 days |
| 214 | For DC RC |
| 215 | Additional charges after 3 days |
| 216 | For Compound Lighting |
| 217 | Additional charges after 3 days |
| 218 | For Parking purpose |
| 219 | Additional charges after 3 days |
| 220 | For Strong Room |
| 221 | Additional charges after 3 days |
| 222 | For Counting |
| 223 | Additional charges after 3 days |
| 224 | S/Drawing single Fl. Fitting complete with tube commercial type of 4’(ft.) fitting box type fitting on hire basis and dismt. The same. |
| 225 | For Commissitioning works |
| 226 | Additional charges after 3 days |
| 227 | For DC RC |
| 228 | Additional charges after 3 days |
| 229 | For Compound Lighting |
| 230 | Additional charges after 3 days |
| 231 | For Parking purpose |
| 232 | Additional charges after 3 days |
| 233 | For Strong Room |
| 234 | Additional charges after 3 days |
| 235 | For Counting |
| 236 | Additional charges after 3 days |
| 237 | S/Providing 250V, 600mm. Cicullar pedastral stand fan on hire basis |
| 238 | For Commissitioning works |
| 239 | Additional charges after 3 days |
| 240 | For DC RC |
| 241 | Additional charges after 3 days |
| 242 | For Parking purpose |
| 243 | Additional charges after 3 days |
| 244 | For Strong Room |
| 245 | Additional charges after 3 days |
| 246 | For Counting |
| 247 | Additional charges after 3 days |
| 248 | S/Providing 250V, 1400mm Sweep A.C. Ceiling fan with down rod as reqd. on hire basis and dismt. the same. |
| 249 | For DC RC |
| 250 | Additional charges after 3 days |
| 251 | For Parking purpose |
| 252 | Additional charges after 3 days |
| 253 | For Strong Room |
| 254 | Additional charges after 3 days |
| 255 | For Counting |
| 256 | Additional charges after 3 days |
| 257 | S/Providing 5/15A, 5-Pin plug pt. Incl. S/F 5A plug socket on suitable size T.W. Board incl. Providing wiring with 7/0.036 P.V.C. cu-wire. Avg. run 3 Mtrs.) |
| 258 | For Commissitioning works |
| 259 | Additional charges after 3 days |
| 260 | For DC RC |
| 261 | Additional charges after 3 days |
| 262 | For Compound Lighting |
| 263 | Additional charges after 3 days |
| 264 | For Parking purpose |
| 265 | Additional charges after 3 days |
| 266 | For Strong Room |
| 267 | Additional charges after 3 days |
| 268 | For Counting |
| 269 | Additional charges after 3 days |
| 270 | S/Providing 5/15A, 5-Pin plug pt. 3 nos. Incl. S/F 15A plug socket on suitable size T.W. Board incl. Providing wiring with 7/0.036 P.V.C. cu-wire. Avg. run 3 Mtrs.) |
| 271 | For Commissitioning works |
| 272 | Additional charges after 3 days |
| 273 | For DC RC |
| 274 | Additional charges after 3 days |
| 275 | For Parking purpose |
| 276 | Additional charges after 3 days |
| 277 | For Strong Room |
| 278 | Additional charges after 3 days |
| 279 | For Counting |
| 280 | Additional charges after 3 days |
| 281 | Operation and maintenance incl. Guarding charges for Elect. Installation (3 nos. shifts incl. Electrician & DG operator) |
| 282 | For Commissitioning works |
| 283 | Additional charges after 3 days |
| 284 | For DC RC |
| 285 | Additional charges after 3 days |
| 286 | For Compound Lighting |
| 287 | Additional charges after 3 days |
| 288 | For Parking purpose |
| 289 | Additional charges after 3 days |
| 290 | For Strong Room |
| 291 | Additional charges after 3 days |
| 292 | For Counting |
| 293 | Additional charges after 3 days |
| 294 | Earthing the Installation with 50mm. Dia. G.I. pipe as per G.S. |
| 295 | For Commissitioning works One time fixed |
| 296 | Additional charges after 3 days One time fixed |
| 297 | For DC RC One time fixed |
| 298 | Additional charges after 3 days One time fixed |
| 299 | For Parking purpose One time fixed |
| 300 | Additional charges after 3 days One time fixed |
| 301 | For Counting One time fixed |
| 302 | Additional charges after 3 days One time fixed |
| 303 | Fixing of Cable socket & glands with proper tools and tackels. 2 Core 10mm2 P.V.C. Ar./Al. Cable |
| 304 | For Commissitioning works One time fixed |
| 305 | Additional charges after 3 days One time fixed |
| 306 | For DC RC One time fixed |
| 307 | Additional charges after 3 days One time fixed |
| 308 | For Compound Lighting One time fixed |
| 309 | Additional charges after 3 days One time fixed |
| 310 | For Parking purpose One time fixed |
| 311 | Additional charges after 3 days One time fixed |
| 312 | For Strong Room One time fixed |
| 313 | Additional charges after 3 days One time fixed |
| 314 | For Counting One time fixed |
| 315 | Additional charges after 3 days One time fixed |
| 316 | Fixing of Cable socket & glands with proper tools and tackels. 4 core 25 sqmm P.V.C. Ar./Al. Cable |
| 317 | For Commissitioning works One time fixed |
| 318 | Additional charges after 3 days One time fixed |
| 319 | For DC RC One time fixed One time fixed |
| 320 | Additional charges after 3 days One time fixed |
| 321 | For Parking purpose One time fixed |
| 322 | Additional charges after 3 days One time fixed |
| 323 | For Strong Room One time fixed |
| 324 | Additional charges after 3 days One time fixed |
| 325 | For Counting One time fixed |
| 326 | Additional charges after 3 days One time fixed |
| 327 | Fixing of Cable socket & glands with proper tools and tackels. 4 core 95 mm2 P.V.C. Ar./Al. Cable |
| 328 | For DC RC One time fixed |
| 329 | Additional charges after 3 days One time fixed |
| 330 | For Parking purpose One time fixed |
| 331 | Additional charges after 3 days One time fixed |
| 332 | For Strong Room One time fixed |
| 333 | Additional charges after 3 days One time fixed |
| 334 | For Counting One time fixed |
| 335 | Additional charges after 3 days One time fixed |
| 336 | Fixing of Cable socket & glands with proper tools and tackels. 4 core 50 sqmm. P.V.C. Ar./Al. Cable |
| 337 | For Strong Room One time fixed |
| 338 | Additional charges after 3 days One time fixed |
| 339 | Hire charges of 500V, 125 KVA, 3-ph Diesel generate set with vibration absorbent incl. Loading, unloading ,carrying charges. |
| 340 | For DC RC |
| 341 | Additional charges after 3 days |
| 342 | For Strong Room |
| 343 | Additional charges after 3 days |
| 344 | For Counting |
| 345 | Additional charges after 3 days |
| 346 | Hire charges of 500V, 62.5KVA, 3-ph Diesel generate set with vibration absorbent incl. Loading, unloading and carrying charges. |
| 347 | For Commissitioning works |
| 348 | Additional charges after 3 days |
| 349 | For DC RC |
| 350 | Additional charges after 3 days |
| 351 | For Compound Lighting |
| 352 | Additional charges after 3 days |
| 353 | For Parking purpose |
| 354 | Additional charges after 3 days |
| 355 | For Strong Room |
| 356 | Additional charges after 3 days |
| 357 | For Counting |
| 358 | Additional charges after 3 days |
| 359 | Supply and pouring of Fuel for the avobe mentioned DG with contractor profit. |
| 360 | For Commissitioning works |
| 361 | Additional charges after 3 days |
| 362 | For DC RC |
| 363 | Additional charges after 3 days |
| 364 | For Compound Lighting |
| 365 | Additional charges after 3 days |
| 366 | For Parking purpose |
| 367 | Additional charges after 3 days |
| 368 | For Strong Room |
| 369 | Additional charges after 3 days |
| 370 | For Counting |
| 371 | Additional charges after 3 days |
| 372 | Make arrangement including Micro Phone/ Horn for counting hall. One Micro Phone + One Horn. |
| 373 | For Commissitioning works |
| 374 | Additional charges after 3 days |
| 375 | For DC RC |
| 376 | Additional charges after 3 days |
| 377 | For Parking purpose |
| 378 | Additional charges after 3 days |
| 379 | For traning |
| 380 | Additional charges after 3 days |
| 381 | Make arrangement including Micro Phone/ Horn for counting hall. Fitting fixing additional horn. |
| 382 | For Commissitioning works |
| 383 | Additional charges after 3 days |
| 384 | For DC RC |
| 385 | Additional charges after 3 days |
| 386 | For Parking purpose |
| 387 | Additional charges after 3 days |
| 388 | For traning |
| 389 | Additional charges after 3 days |
| 390 | Make arrangement including Micro Phone/ Horn for counting hall. Micro Phone(wired). |
| 391 | For Commissitioning works |
| 392 | Additional charges after 3 days |
| 393 | For DC RC |
| 394 | Additional charges after 3 days |
| 395 | For Parking purpose |
| 396 | Additional charges after 3 days |
| 397 | For traning |
| 398 | Additional charges after 3 days |
| 399 | Make arrangement including Micro Phone/ Horn for counting hall. Cordless Micro Phone. |
| 400 | For Commissitioning works |
| 401 | Additional charges after 3 days |
| 402 | For DC RC |
| 403 | Additional charges after 3 days |
| 404 | For Parking purpose |
| 405 | Additional charges after 3 days |
| 406 | For traning |
| 407 | Additional charges after 3 days |
| 408 | Make arrangement including Micro Phone/ Horn for counting hall. Amplifier |
| 409 | For Commissitioning works |
| 410 | Additional charges after 3 days |
| 411 | For DC RC |
| 412 | Additional charges after 3 days |
| 413 | For Parking purpose |
| 414 | Additional charges after 3 days |
| 415 | For traning |
| 416 | Additional charges after 3 days |
| 417 | Make arrangement including Micro Phone/ Horn for counting hall. Speaker |
| 418 | For Commissitioning works |
| 419 | Additional charges after 3 days |
| 420 | For DC RC |
| 421 | Additional charges after 3 days |
| 422 | For Counting |
| 423 | Additional charges after 3 days |
| 424 | Hire charges of temporary air conditoning system with following type of AC machine S & Installation on temporary basis stand A.C. of capacity 2 ton with allied works as per req. |
| 425 | For Commissitioning works |
| 426 | Additional charges after 3 days |
| 427 | For DC RC |
| 428 | Additional charges after 3 days |
| 429 | For traning |
| 430 | Additional charges after 3 days |
| 431 | Hire charges of temporary air conditoning system with following type of AC machineS & Installation on temporary basis stand A.C. of capacity 4 ton with allied works as per req. |
| 432 | For Commissitioning works |
| 433 | Additional charges after 3 days |
| 434 | For DC RC |
| 435 | Additional charges after 3 days |
| 436 | For traning |
| 437 | Additional charges after 3 days |
| 438 | Providing on hire basis supply and installtion temporary 2nos.400v,63A KIT KAT fuse unit inside kiosk with proper tools and tackles |
| 439 | For Commissitioning works |
| 440 | Additional charges after 3 days |
| 441 | For Parking purpose |
| 442 | Additional charges after 3 days |
| 443 | Providing on hire basis supply and installtion temporary 400V ,32A KIT KAT fuse unit inside kiosk with proper tools and tackles |
| 444 | For Strong Room |
| 445 | Additional charges after 3 days |
| 446 | Supply and profiding on hire basis and installation of 230 volt 63 amp Euro Onload changeover. |
| 447 | For Commissitioning works |
| 448 | Additional charges after 3 days |
| 449 | For Compound Lighting |
| 450 | Additional charges after 3 days |
| 451 | For Parking purpose |
| 452 | Additional charges after 3 days |
| 453 | For traning |
| 454 | Additional charges after 3 days |
| 455 | S/Providing on hire basis 250 Wt. H.P.S.V./Metal Halide LED flood light fittings complete with bracket and clamp incl. Dismt. After the end of the programme as per direction of Engg.- In – Charge. |
| 456 | For DC RC |
| 457 | Additional charges after 3 days |
| 458 | For Compound Lighting |
| 459 | Additional charges after 3 days |
| 460 | For Parking purpose |
| 461 | Additional charges after 3 days |
| 462 | For Strong Room |
| 463 | Additional charges after 3 days |
| 464 | Providing on hire basis supply and making 4 -pole temporary structure made from wooden pole /prop. G.I pipe support for mounting above 10 Mtr. Height (approx) with 6 nos.200 watt H.P.S.V /Metal Halide flood light LED fittings.The said structure will protect the installation from strong wind. |
| 465 | For Parking purpose |
| 466 | Additional charges after 3 days |
| 467 | Providing on hire basis supply and fixing of 20Watt. rechargable emergency LED light with proper tools and tackles(for outside passage near strong room) |
| 468 | For Strong Room |
| 469 | Additional charges after 3 days |
| 470 | Hiring charge of 2000 Watts Inveter set for uninterupted connection of emergengy light fitted & fixed in position complete in all respect and removed all after the completion of election for one month. |
| 471 | For Strong Room |
| 472 | Additional charges after 3 days |
| 473 | Providing on hire basis supply and installation of 80 Watt Street Light pole including 80 Watt LED with temporary foundation and earting. |
| 474 | For DC RC |
| 475 | Additional charges after 3 days Please Enable Macros to View BoQ information |