| 1 | SH:RCC Drain with slab cover - 556.06 Mtrs. |
| 2 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a leadof 50m. |
| 3 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 4 | Reinforced concrete work in foundations,footings,bases of columns etc. and mass concrete excluding cost of centering,shuttering and reinforcement in:A) M20 1:1.5:3 (1cement:1.5 course sand:3 stone aggregate 20mm nominal size). |
| 5 | Reinforement cement concrete in walls(any thickness including attached pillasters,Buttresses, Plinth Wall and string course filet etc from top of foundation upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3(1cement:3fine sand) of thickness not exceeding 6mmm to gives a smooth and even surface excluding cost of centering and shuttering and reinforcemrnt. A) M20 1:1.5:3 (1cement:1.5 course sand:3 stone aggregate 20mm nominal size). |
| 6 | Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). |
| 7 | Reinforcement of RCC work including bending,binding and placing in position complete.a) Tar/TMT steel |
| 8 | 12mm cement plaster 1:3(1cement:3 fine sand) |
| 9 | Neat Cement punning |
| 10 | Centring and shuttering including strutting,proping etc and removal of form work fora) Foundation and plinth |
| 11 | b)Wall(Any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 12 | c) Suspended floors,roofs,landings shelves and their supports,balconies and chajjas 3.5m height). |
| 13 | Add Carriage Charge |
| 14 | SH:Cattle Trap/Culvert - 3 Nos. |
| 15 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a leadof 50m. |
| 16 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. |
| 17 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 18 | Reinforced concrete work in foundations,footings,bases of columns etc. and mass concrete excluding cost of centering,shuttering and reinforcement in:A ) M20 1:1.5:3(1cement:1.5 course sand:3 stone aggregate 20mm nominal size). |
| 19 | Reinforement cement concrete in walls(any thickness including attached pillasters,Buttresses, Plinth Wall and string course filet etc from top of foundation upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3(1cement:3fine sand) of thickness not exceeding 6mmm to gives a smooth and even surface excluding cost of centering and shuttering and reinforcemrnt. A) M20 1:1.5:3(1cement:1.5 course sand:3 stone aggregate 20mm nominal size). |
| 20 | Reinforcement of RCC work including bending, binding and placing in position complete.a) Tar/TMT steel |
| 21 | 12mm cement plaster 1:3(1cement:3 fine sand) |
| 22 | Neat Cement punning |
| 23 | Centring and shuttering including strutting,proping etc and removal of form work fora) Foundation and plinth |
| 24 | b)Wall(Any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 25 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.b) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 26 | Add Carriage Charge Please Enable Macros to View BoQ information |