| 1 | Civil Works |
| 2 | Supply of water based runway / apron / road marking paint or equivalent approved brand of Berger/Nerolac /Asian/ITS in sealed packed in 20 / 30 Litre container of any required colour including delivery as specified. Supply of quantity shall be as per expected consumption within four month and as directed by Engg-In-Charge. (a) White colour (Confirming to IS 164:1981) |
| 3 | Supply of water based runway / apron / road marking paint or equivalent approved brand of Berger/Nerolac /Asian/ITS in sealed packed in 20 / 30 Litre container of any required colour including delivery as specified. Supply of quantity shall be as per expected consumption within four month and as directed by Engg-In-Charge. (b) Golden Yellow ( Confirming to IS 164:1981) |
| 4 | Supply of water based runway / apron / road marking paint or equivalent approved brand of Berger/Nerolac /Asian/ITS in sealed packed in 20 / 30 Litre container of any required colour including delivery as specified. Supply of quantity shall be as per expected consumption within four month and as directed by Engg-In-Charge. (c) Reflective Yellow (WBR) |
| 5 | Supply of water based runway / apron / road marking paint or equivalent approved brand of Berger/Nerolac /Asian/ITS in sealed packed in 20 / 30 Litre container of any required colour including delivery as specified. Supply of quantity shall be as per expected consumption within four month and as directed by Engg-In-Charge. (d) Black colour (WBR) |
| 6 | Supply of water based runway / apron / road marking paint or equivalent approved brand of Berger/Nerolac /Asian/ITS in sealed packed in 20 / 30 Litre container of any required colour including delivery as specified. Supply of quantity shall be as per expected consumption within four month and as directed by Engg-In-Charge. (e) Red colour (WBR) |
| 7 | Supply of Glass beads(Class B) to be sprayed over the water based reflective( WBR) paint strip (Glass beads class B product specification as per MORTH 803.4.2 confirming to BS 6088:1981) |
| 8 | Painting runway/taxi track/apron marking by mechanized means with One or more coats to give uniform finish with road marking paint of superior make (Road marking paint will be supplied by department ) i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete. Depending on the need and frequency, painting will be done weekly, monthly, or every six months as required. |
| 9 | Painting runway/taxi track/apron marking by mechanized means with Two or more coats to give uniform finish with road marking paint of superior make (Road marking paint will be supplied by department ) i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete. Depending on the need and frequency, painting will be done weekly, monthly, or every six months as required. |
| 10 | Lettering with Runway marking paint (Road marking paint will be supplied by department) on apron/runway/taxiway surface after required/prescribed grid marking, i/c background and outline/border painting all complete as per satisfaction/direction of Engineer-In-Charge. (a) For new work (Two or more coats) |
| 11 | Lettering with Runway marking paint (Road marking paint will be supplied by department) on apron/runway/taxiway surface after required/prescribed grid marking, i/c background and outline/border painting all complete as per satisfaction/direction of Engineer-In-Charge. (b) For old work (One or more coats) |
| 12 | Provision of deweeding through motarised spraying of weedicides (Glyphosate 41% or equivalent) and removal of dead grass along runway shoulder edges, depressed portion of pavement, joints etc. Chemical dilution shall be as per manufacturer guidance, all complete with satisfaction of Engineer-In-Charge. |
| 13 | Deduction of taking away empty paint containers 10/20/30 litre after work is completed. The empty paint container so received shall be the property of the contractor and shall be counted and handed over in the presence of the Engineer-in-Charge or his authorized representative. |
| 14 | Removal of Old & Conflicting Paint Markings on runway/Taxiway/ Apron area using chemical & mechanical brush/grinder as per direction & satisfaction of Engineering-in-charge. Please Enable Macros to View BoQ information |