| 1 | Excavation for structureA. With Out Dewatering Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.I. Ordinary Soil |
| 2 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I. Sand filling |
| 3 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)I. P.C.C grade M 10 (using jhama brick aggregate)(i) Nominal mix 1:3:6 |
| 4 | Plain/reinforced cement concrete in substructure complete including formwork as per drawings & MoRD technical specification Clauses 802, 804, 805, 806, 807, 900, 1202 & 1204.(including centering, shuttering, staging etc. but excluding reinforcement).VI. R.C.C grade M-25i) upto 5 m height |
| 5 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar in substructure complete as per drawings & MoRD technical specification Clauses 1002, 1005, 1010 and 1202. |
| 6 | Supply and fabrication of mild steel of IS:2062 structural steel work at fabricators workshop comprising of main truss, cross girders, deck stringers, wind bracings, kerb channel, jacking beams, connecting plates and other members and delivered at bridge site in undamaged condition including straightening, descaling, degreasing, cutting to size and shape, drilling, welding and grinding, supply of all MS/HTS shop or site bolts, nuts & washers, holding down bolts and nuts etc., trial assembling at workshop, one priming coat of shop paint with red lead paint conforming to IS-102 with all labour, material, cost of paints, consumables, stacking in protected condition etc. complete as per MoRT&H technical specification Clause 1900 and as directed by the Engineer-in-Charge Please Enable Macros to View BoQ information |