| 1 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401. |
| 3 | Providing laying spreading and compacting stone aggregates of water bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber applying and brooming requisite type of screening materials stone dust to fill-up the interstices of course aggregtate watering and compacting to the required density grading 2 as per Technical Specification clause 405. |
| 4 | Providing laying spreading and compacting stone aggregates of water bound macadam specification including spreading in uniform thickness hand packing-rolling with 3- wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber applying and brooming requisite type of binding materials stone dust to fill-up the interstices of course aggregtate watering and compacting to the required density grading 3 as per Technical Specification clause 405. |
| 5 | Brick edging 7.00 cm. wide on both sides of the road by M-150 bricks complete as per PWD detailed specification No. 20.15 as per Technical Specification clause . |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification clause 502. |
| 7 | Providing and applying Tack coat with bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bitumen surface cleaned with Hydraulic broom as per Technical Specification clause 503. |
| 8 | Providing laying and rolling of Open-graded premix surfacing of 20 mm compacted thickness composed of 13.20 mm to 11.20 mm sizes of aggregates mix Ratio 2:1 either using pnetration grade bitumen or emulsion to the required line grade and level to serve as wearing course on a previously prepared base. including mixing in a suitable plant, laying and rolling with a three smooth wheeled roller 80-100 tonne capacity, and finishing to required level as per Technical Specification clause 508. |
| 9 | Providing and laying seal coat sealing 6.7mm stone grit @0.009 cum per sqm the voids in a bituminous grade VG-10 @0.65kg per sqm surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. |
| 10 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 11 | Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. |
| 12 | The routine maintenance of road Trikoliya Akhand nagar (ODR) ke Km.-1 se Rajit Ram ke Ghar tak sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including all taxes, labour cess etc but excluding GST) For 1st Year maintenance Cost |
| 13 | The routine maintenance of road Trikoliya Akhand nagar (ODR) ke Km.-1 se Rajit Ram ke Ghar tak sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(Including all taxes, labour cess etc but excluding GST) For 2nd Year maintenance Cost |
| 14 | The routine maintenance of road Trikoliya Akhand nagar (ODR) ke Km.-1 se Rajit Ram ke Ghar tak sampark marg .road including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including all taxes, labour cess etc but excluding GST) For 3rd Year maintenance Cost |
| 15 | The routine maintenance of road Trikoliya Akhand nagar (ODR) ke Km.-1 se Rajit Ram ke Ghar tak sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 4th Year maintenance Cost |
| 16 | The routine maintenance of road Trikoliya Akhand nagar (ODR) ke Km.-1 se Rajit Ram ke Ghar tak sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 5th Year maintenance Cost Please Enable Macros to View BoQ information |