| 1 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including all taxes, labour cess etc but excluding GST) |
| 2 | Providing laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base. (Including all taxes, labour cess etc but excluding GST) |
| 3 | Providing laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base/base (Including all taxes, labour cess etc but excluding GST) |
| 4 | Providing and applying Tack coat with bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bitumen surface cleaned with Hydraulic broom as per Technical Specification clause 503. (Including all taxes, labour cess etc but excluding GST) |
| 5 | Providing laying and rolling of Open-graded premix surfacing of 20 mm compacted thickness composed of 13.20 mm to 11.20 mm sizes of aggregates mix Ratio 2:1 either using pnetration grade bitumen or emulsion to the required line grade and level to serve as wearing course on a previously prepared base. including mixing in a suitable plant, laying and rolling with a three smooth wheeled roller 80-100 tonne capacity, and finishing to required level as per Technical Specification clause 508. (Including all taxes, labour cess etc but excluding GST) |
| 6 | Providing and laying seal coat sealing 6.7mm stone grit @0.009 cum per sqm the voids in a bituminous grade VG-10 @0.65kg per sqm surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. (Including all taxes, labour cess etc but excluding GST) |
| 7 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including all taxes, labour cess etc but excluding GST) |
| 8 | Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. |
| 9 | The routine maintenance of road Budhupur Bagharwara sampark marg se Matiyara sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including all taxes, labour cess etc but excluding GST) For 1st Year maintenance Cost |
| 10 | The routine maintenance of road Budhupur Bagharwara sampark marg se Matiyara sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(Including all taxes, labour cess etc but excluding GST) For 2nd Year maintenance Cost |
| 11 | The routine maintenance of road Budhupur Bagharwara sampark marg se Matiyara sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including all taxes, labour cess etc but excluding GST) For 3rd Year maintenance Cost |
| 12 | The routine maintenance of road Budhupur Bagharwara sampark marg se Matiyara sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 4th Year maintenance Cost |
| 13 | The routine maintenance of road Budhupur Bagharwara sampark marg se Matiyara sampark marg including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (Including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 5th Year maintenance Cost Please Enable Macros to View BoQ information |