| 1 | Safe loading & carriage including & proper stracking of following store material from ESC Lucknow /JE store to site of work . |
| 2 | 33 KV 3x300 sq mm XLPE Cable |
| 3 | 33 KV 3x300 sq mm XLPE St/Th J/Kit |
| 4 | 33 KV 3x300 sq mm XLPE O/D J/Kit |
| 5 | 33 KV CT PT UNIT |
| 6 | PCC Pole 11 Mtr Long |
| 7 | 33 KV Pin Insulator |
| 8 | 33 KV Pin with nut |
| 9 | MS earthing rod 20x2500 mm |
| 10 | MS angle 65x65x6MM 5.8 kg / Mtr. For bracing |
| 11 | Top Channel 125x65 sq mm |
| 12 | LT PVC Cable 1x400 sq mm |
| 13 | M.S.Angle 1000x50 sqmm for mounting ct pt |
| 14 | 33 kv meetering cubical |
| 15 | 33 KV TVM METER NET CONFIGURATION |
| 16 | Laying of 33 kV 3x300 sq. mm XLPE cable D/C including digging of trench 1050 mm deep, 750 mm wide along with required material Sand (0.195 Cub/Mtr), Ist class bricks (26.25 Nos/Mtr), stone pad (2.2 Nos size 600x750x50 mm). The inter axial spacing between two cable should be in between 0.32 M to 0.40 M. (As per JE instruction) and back filling the trench by soil (All the material required for laying will be supplied by the contractor except 33 kV XLPE cable) |
| 17 | 33 kv3x300 Sq. Mm XLPE cable laying in MS/GI pipe 150mm dia single circuit (All the material shall be provided by the contractor except cable) as per resspo norms. |
| 18 | 33 kv 3x300 sq. mm XLPE cable laying in RCC Pipe S/C.(All the material shall be provided by the contractor except 33kvcables)as per resspo norms. |
| 19 | Cable laying by drill method HDD single circuit (All the material shall be provided by the contractor except 33 kv cables) |
| 20 | Hoisting of 33 kv 3x300 sq. mm XLPE Cable on D/P with GI Pipe dia 6\\" its jumpring complete with the help of LT PVC CABLE 1X400 SQMM complete with clamps , al lug, nuts and bolts .(All the material shall be provided by the contractor except 33kv cables, LT PVC CABLE 1X400 SQMM & O/D J/K. )as per RESSPO NORMS |
| 21 | Hoisting of 33 kv 3x300 sq. mm XLPE Cable on cable stand its jumpring complete with clamps , nuts and bolts .(All the material shall be provided by the contractor except 33kv cables & O/D J/K. )as per RESSPO NORMS |
| 22 | Digging of pit of size 3x2x1 mtr. For making straight through joint 33KV work included filling of soil levelling and ramming of the same(ST/Th Providing by department ) |
| 23 | High pressure testing of 33kv 3x300 sq.mm.XLPE cable .Testing equipment will be arranged by the contractor |
| 24 | Providing ,fixing &grouting of stone cable route marker on cable route .displaying feeder name, voltage & depth.(All the material shall be provided by the contractor) as per norms. |
| 25 | Fabrication & erection of 33 KV cable exposure type double pole with the provision of separate bus bar for each cable with fixing of necessary clamps and other accessories like danger board, number plate, barbed wire, 9 no. pin insulators with pins,2 no. channels 100x50 mm (1600mm each),1 no.MS channel 100x50 mm(3200mm in length) and 2 no.MS angle 65x65x6 mm (each 3200mm in length ) for supporting the hoisting of cable etc. Its jumpering by single core PVC aluminium cable with proper size of lug as per RESSPO norms.(All material to be arranged by contractor except PCC Pole, MS Channel, MS Angle, 33 KV Pin Insulator, 33 KV Pin with nut &PVC cable). |
| 26 | Grouting of Pole in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mm x 45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per RESSPO norms. |
| 27 | Earthing by way of boring and lowering of \\"B\\" Class GI pipe 50 mm dia from ground upto the water level(minimum 40 mtr. Deep )as per standard practice (All material shall be provided by the contractor except the supplied items )as per resspo norms. |
| 28 | Mounting of 33 KV CTPT UNIT on double pole structure by making base using 100x50 ms angle and fixing of clamp, nut bolts etc. (Nut bolt and clamp will be provided by contractor). |
| 29 | Fabrication & erection of cable stand with grouting & plinthing as per resspo norms .(steel material provided by department) |
| 30 | Scanning/Tracing of existing underneath power cables, water pipe line, gas pipe line, sewer pipe line on proposed route to avoid possibilities of any kind of damage during digging of trench/drilling for laying cable. (Scanning machine will be provided by the contractor) |
| 31 | Installtion of meter cubical inside the meter room by safe carriage and dragging and connected to earting by GI strip 50x6sqmm |
| 32 | Contruction of meter cubical room of size 3.2x3.2x3.2 mtr also contruct cable trench of size 3.2X0.9X0.9 mtr inside the cable trench 0.8x0.8 mtr sand must be filled Please Enable Macros to View BoQ information |