| 1 | Dismantaling of existing structure like culverts bridge retaining wall and other structure comprising of brick cement concret wood work steel work including T&P and scaffolding……stocking the serviceable material with all lift and lead 1000 meters.. |
| 2 | Earth work in Excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 3 | Filling of GSB in foundation trenches as per drawing and Technical Specification clause 401. |
| 4 | Providing concrete for plain/rainforced concrete in M-10 open foundations complete as per drawings and technical specification Clauses 802,803,1202, 1203 |
| 5 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering as per drawing and technical specification clauses 602, 603, 604, 1202 & 1204 |
| 6 | Providing and laying reinforcement cement cocrete (M-25) in foundation as per drawing and technical specification clauses 800, 1205.4 1205.5 |
| 7 | Supply of fitting and Placing HYSD bar reinforcement in substructure complete as per drawing and technical specification |
| 8 | Providing and laying reinforcement cement cocrete wearing course (M-30) in foundation as per drawing and technical specification clauses 800, 1205.4 1206.3 |
| 9 | Providinding weep holes in brick masonary/ stone masonary plain /reinforcement concrete abutment wingwall, returnwall with 100mm dia PVC pipe extending through the full with of the structure with slope 1:20 all work complete as per drawing and technical specification. |
| 10 | Pointing with cement mortar (1:3) on brickwork/ C.R. Stone masonry as per drawing and technical specification Clause 613.3 and 1204 |
| 11 | Providing and laying Filter media in back filling completes as per drawing and technical specification claluse 1301. |
| 12 | Providing concrete for plain/rainforced concrete in open foundations (M-15) complete as per drawings and technical specification Clauses 802,803,1202, 1203 |
| 13 | Providing and laying boulder apron for bed protction with stone boulder of minimum size and weight as per Table 1300.1 no fragment weighting not less than 25 kg laid dry complete as per drawing and technical specification claluse 1301. |
| 14 | Providing and laying Filter media under pitching in slopes completes as per drawing and technical specification claluse 1301. |
| 15 | Providing and laying pitching on slopes laid over prepared Filter media, complete as per drawing and technical specification claluse 1302. |
| 16 | Construction of Embankment with material optain from Borrow Pits with a lift up to 1.0 mtr, transporting to site, spreading, grading to required slope and compacted to meet requirement of table no.300.1 and 300.2 cartage up to 1 Km. |
| 17 | Providing and laying reinforced cement concrete pipe NP3 culvert on first class bedding of granular material including fixing coller with cement mortar 1:2 but excluding excavation, protection works. Backfilling, concrete and masonry works .(900mm dia Hume Pipe) |
| 18 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber,, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405 |
| 19 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 20 | Prime Coat ( Slow Setting) Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 21 | Tack Coat Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular base surface cleaned with mechanical broom. |
| 22 | 20mm thick Open-Graded Premix Carpet using Bituminous Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. |
| 23 | Seal Coat - Type C (Mechnical Method) Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat. Please Enable Macros to View BoQ information |