| 1 | SERVICING AND REPAIRING OF ELECTRICAL AND MECHANICAL SYSTEM FOR PROPER OPENING, CLOSING & TRIPPING OF 11 KV BREAKER (WARRANTY PERIOD WILL BE SIX MONTH) (DATE OF REPAIR WILL BE MENTIONED AFTER REMOVAL OF FAULT ON PANNEL WITH PERMANENT MARKER OR PAINT AND IN MAINTENANCE REGISTER ALSO.) ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 2 | IN CASE OF EMERGENCY BREAKDOWN VCB REPAIRING ETC WORK LINE CLEANING AND REFITTING AFTER REMOVAL OF FAULT WITH IN 1 HOUR AFTER GETTING INFORMATION AND WARRANTY PERIOD WILL BE SIX MONTH. (DATE OF REPAIR WILL BE MENTIONED AFTER REMOVAL OF FAULT ON PANNEL WITH PERMANENT MARKER OR PAINT AND IN MAINTENANCE REGISTER ALSO.) ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 3 | PROVIDING, REPLACEMENT AND COMMISSNING OF 11 KV CT 600/300/5 As per RESSPO Norms. (Make GCL, BHEL, SCHEMER, L&T TOSIBA, YAMUNA, C-SEC, PASCAL, STELMAKE ETC. ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 4 | PROVIDING, REPLACEMENT AND COMMISSNING OF 11 KV CT 400/200/5 As per RESSPO Norms. (Make GCL, BHEL, SCHEMER, L&T TOSIBA, STELSTELMAKE ETC. ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 5 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE 11 KV POTENTIAL TRANSFORMER ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 6 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE 11 KV PANEL O/C + E/F IDMT Relay WITH RETROFITTING ARRANGEMENT MAKE ASHIDA, SCHNEIDER, C&S ETC. AS PER PVVNL STANDARD ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 7 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE 11 KV PANEL MASTER RELAY WITH RETROFITTING ARRANGEMENT MAKE ASHIDA, SCHNEIDER, C&S ETC. AS PER PVVNL STANDARD ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 8 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE HT HRC FUSE FOR PT OF APPROPRIATE RATING ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 9 | PROVIDING, REPLACEMENT AND COMMISSNING OF 11 KV VCB SPRING CHARGING MOTOR OF APPROPRIATE RATING OF STANDARD MAKE ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 10 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE/BURNT MCB OF APPROPRIATE RATING ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 11 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE/BURNT AUXILLARY SWITCH OF APPROPRIATE RATING ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 12 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE ANTIPUMPING RELAY ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 13 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE SPOUT, R, Y, B PAHSE INCOMING & BUS-BAR SIDE ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 14 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE JAW (MALE/FEMALE) FOR 11 KV VCB TROLLEY ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 15 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE INDICATOR ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 16 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE AMPERE METER ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 17 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE VOLT METER ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 18 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE TNC SWITCH ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 19 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE LOCAL/REMOTE SWITCH ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 20 | PROVIDING, REPLACEMENT AND COMMISSNING OF DEFECTIVE BUZZER ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR IN ALL RESPESTS |
| 21 | REPLACEMENT & SUPPLY OF DEFECTIVE CLOSING COIL (24 V.D.C) AS PER PVVNL STANDARD ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR |
| 22 | REPLACEMENT & SUPPLY OF DEFECTIVE TNC SWITCH AS PER PVVNL STANDARD ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR |
| 23 | PROVIDING AND ERRECTION OF PIPE EARTHING VIA 2 INCH DIA GI PIPE (3MM) UPTO 40 FEET ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR |
| 24 | PROVIDING, REPLACEMENT AND COMMISSNING OF DAMAGE HEATER WITH ENERGATION COMPLETE ALL REQUIRED MATERIAL, MANPOWER AND T&P WILL BE PROVIDED BY CONTRACTOR Please Enable Macros to View BoQ information |