| 1 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 2 | Supplying & Stacking of Filling earth at site including carriage loading & unloading (earth measured in stacks will be reduced 20% for payment). |
| 3 | Leveling in ordinary soil by mechanical device i.e Tractor 35 HP with cultivator/harrow and leveler wuth one no beldar etc. |
| 4 | Supplying and stacking of good earth at including royalty and carriage upto 05 km lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 5 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (Manure measured in stacks will be reduced by 8% for payment.) |
| 6 | Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge. |
| 7 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 8 | Rough dressing the trenched ground including breaking clods. |
| 9 | Fine Dressing of the ground |
| 10 | Supplying at site fine selection one grass free from weeds freshly lifted from a well maintained lawn. Grass will be supplied in carpets |
| 11 | Grassing with selection No. 1/ Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). In Rose 5 cm a part in both directions. |
| 12 | Kachha Footpath |
| 13 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge. |
| 14 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) |
| 15 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 16 | Supplying and Stacking at siteMoorum |
| 17 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work (DSR Code.No-13.61.1) AOR |
| 18 | Benches Set of 3Having total Wt. 70-75 kgs, size: 5 ft length garden benches (70-75 kg cast iron legs with 7 tank powder coating with 8 nos fiber 4mm thick strips with stainless steel nut bolt, Seating material frames/patii-FRP: (Fibre-reinforced plastic). (With Supply, fixing, installation, G.S.T & Other taxes. |
| 19 | Submersible pump boring as following |
| 20 | Supply of PVC pipe 6Kg /Cm2 pressure with required PVC standard special confirming to IS : 4985-2000 with latest amendment Maker- finolex industries Lts. /Kisan/ upremeindusries Ltd (Rate as per comparative Statement per Rm) 140 mm dia with coupler @ 6kgf/cm2 pressure |
| 21 | Supply of 50 mm dia G.I .Pipe Class B. |
| 22 | Supply of Steiner Cloth coupler solution for jointing the pipe etc complete |
| 23 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, upto 90 meter depth below ground level. up to 300 mm dia rate for 0-60 mtr depth |
| 24 | Submersible pump installation as following |
| 25 | Supply & fixing of Submersible moter pump (Make kirloskar, KSB and CRI. 5HP 18 % GST |
| 26 | Supply of flat electrical cable three core 4.00 mm plaza make ISI mark. |
| 27 | Maintenance |
| 28 | Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & Cost /Supply lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge.4.39*24 month= 105.36 |
| 29 | \\"Providing profuse watering arrangements at site to Make available RH pipe/Canvas Pipe & T&P Repairing of Submersible Pumps, DG. Set etc. in the process of watering as per direction of the in charge of work.Avarage 03 Nos Irrigation per month/acre total irrigation=36 Nos4.39*24 month= 105.36 |
| 30 | Supplying and stacking of good earth at including royalty and carriage upto 05 km lead complete (earth measured in stacks will be reduced by 20% for payment). |
| 31 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (Manure measured in stacks will be reduced by 8% for payment.) |
| 32 | Pruning, trimming, shaping of trees/shrubs (ht 15 feet and above) i/e removal of cut materials upto 50mt. lead and as per direction of officer in charge (necessary T & P shall be arranged by the Contractor). |
| 33 | Tractor with trolley including P.O.L. & Driver GST extra as per aplicable Please Enable Macros to View BoQ information |