|
| 1 | PART-A |
| 2 | Carrying out Operation and Maintenance of 2 TPD Biogas plant by providing one Operator in general shift, including preventive maintenance and lubrications, minor consumables and annual calibrations of Biogas flow meter (without NABL certification) and reliever operator on weekly off and holidays |
| 3 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available.Name of Equipment: Shredder [Capacity of Motor 5 HP 3 Phase] |
| 4 | Oil seal |
| 5 | Rewinding for 3 Phase Motor [5HP] As and when break down arises |
| 6 | Bearing - SKF or equivalent |
| 7 | Stationary Cutter |
| 8 | Rotary Cutter |
| 9 | Adapter |
| 10 | Insert key |
| 11 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available.Name of Equipment: Submersible Feed Pump [Motor Rating: 3 HP 3 Phase] |
| 12 | Bearing - SKF or equivalent |
| 13 | Mechanical Seal - NBR |
| 14 | Oil Seal - NBR |
| 15 | Cable |
| 16 | Rewinding for 3 Phase Motor [3 HP] - As and when break down arises |
| 17 | Impeller |
| 18 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available.Name of Equipment: Scum Breaker [Motor Rating: 0.50 HP 3 Phase] |
| 19 | Gear Box Motor - Rewinding for 3 Phase motor [0.50HP] |
| 20 | Gear oil |
| 21 | Bearing - SKF or equivalent |
| 22 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available.Name of Equipment: Twin Lobe Biogas Blower [Motor Rating: 3 HP 3 Phase] |
| 23 | Motor Rewinding - 3 Phase [3 Hp] - As and when break down arises |
| 24 | Set of Bearings - SKF or equivalent |
| 25 | Set of Gasket |
| 26 | Set of Oil Seal |
| 27 | Set of Rings |
| 28 | Set of PTFE Strips |
| 29 | Side cover surface grinding |
| 30 | Twin lobes |
| 31 | V belt |
| 32 | Gear oil |
| 33 | Shaft machining & lathe work |
| 34 | Pressure Guage 4 \\" Dial Size, Range -0-1 bar |
| 35 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available.Name of Equipment: Control Panel |
| 36 | VSP - 415V, D1 Minilec make |
| 37 | Relay [Pump] - [4.5 - 7.5] A, Mn2 |
| 38 | Relay [Blower] - [4.5 - 7.5] A, Mn2 |
| 39 | Relay [Shredder] - [4.5 - 7.5] A, Mn2 |
| 40 | Relay [Scum breaker] - [1.4-2.3] A, Mn2 |
| 41 | MCB - 6A, 3 pole Legrand or any otherequivalent |
| 42 | Contactor - Mnx12, 230V L & T make |
| 43 | Contactor - Mnx9, 230V L & T make |
| 44 | Timer - 800 XC, 230V |
| 45 | MCB - 16A, 3 pole Legrand or Equivalent |
| 46 | MCB - 32 A, 4 pole Legrand or equivalent |
| 47 | 2way Switch 1 Pole |
| 48 | Phase Indicators |
| 49 | 3 core UG, Copper cable- 1.5 Sq.mm |
| 50 | Digital Volt and Ammeter Indicator - 3 Phase |
| 51 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available.Miscellaneous Piping and Fitments |
| 52 | Non-Return Valve- Ball Type - CI - 2'', Flange End |
| 53 | Non-Return Valve Spring Type - 2'' Brass: Threaded end |
| 54 | Non-Return Valve Spring Type - 2'' PVC |
| 55 | PP Ball Valve- Flange End - 2'' |
| 56 | Ball Valve - 1'‘: Brass Type, Threaded end |
| 57 | Ball Valve - 1/2'‘: Brass Type, Threaded end |
| 58 | Nut and Bolt with Double Washer- GI |
| 59 | Gasket - Rubber - 5mm |
| 60 | Butter fly valve 6\\" |
| 61 | Balloon center cell |
| 62 | Bio gas Moisture trap |
| 63 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available. |
| 64 | Supply, loading & unloading and transportation of fresh Cow dung for 1st year |
| 65 | PART-B : Requirement of Spares - As and When Required [During repair & Maintenance] and as directed by Engineer-in-Charge. The spares are of ISI marked wherever available. |
| 66 | Supply, loading & unloading and transportation of fresh Cow dung for 2nd year Please Enable Macros to View BoQ information |