| 1 | Bill of Quantity - PLATRFARM |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. DSR 2023- 2.31 |
| 3 | Boring of pile hole 200 mm diameter ,3.50 m deep single under reamed of 50 cm diameter I/c all as directed by engineer in charge. (SOR. Dt. 25.07.2022 - chapter no. 4 new item 1) |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.DSR 2023- 2.2.8. |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering finishing and reinforcement - All work up to plinth level 1:1½:3 cement, coarse sand and 20mm gauge stone grit including all complete. DSR 2023- 5.1.2 |
| 6 | Foundations, footings, bases of columns, etc. for concrete Shuttering - DSR 2023- 5.9.1 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) DSR 2023- 6.1.1 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 - .5.2.2 |
| 9 | Foundations, footings, bases of columns, etc. for concrete Shuttering - DSR 2023- 5.9.1 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 5.30 |
| 11 | roofs, landings, balconies and access platform . for concrete Shuttering - DSR 2023- 5.9.3 |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D. DSR 2023- 5.22.6 |
| 13 | Plaster 12 mm thick with cement, fine sand mortar in proportion of 1:6 in fair side of wall I/c all complete as directed by engineer in charge etc. DSR 2023- 13.4.2 |
| 14 | Excavating, supplying and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR 2023- 2.5 (a) |
| 15 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm) DSR 2023 - 13.44.1 |
| 16 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 2023 - 13.80 |
| 17 | Supply and fixing of Add Sign board / Sila Patt & photography etc. (For Estimate Purpuse) |
| 18 | Bill of Quantity - Interlocking |
| 19 | Earth work in filling in sub grade ,earth transported from 5.00 km distance & mechanically compacting with road roller or iron hammer I/c hire and fuel charges of roller and I/c all materials, labour , T&P , all taxes etc all complete as per directed by Engineer in charge. |
| 20 | Construction of granular sub base by providing well graded material, spriding in uniform layers with motor grader on prepared surface mixing by mix in place method with roatvetor at OMC .and compacting with smooth wheel roaller to achieve the desiersd density, complet as per technical specification Clause 401 |
| 21 | Providing, laying spreading and compacting stone aggregates of specific sizes to water bound macadom specification including spreading in uniform thickness hand packing, rolling with smooth wheel roller 80 - 100 KN in stages to proper grade and camber, apploying and brooming, stone screening to fillup the interstices of coarse aggregate, watering and compacting to the required density .Grading-3 as per technical specification class 405 |
| 22 | Laying of 80 mm thick cement concrete paver block (interlock bricks) with 40 mm thick stone dust including preaparation of base and joint filling all complete. C.h. No. 4 new item no. 3 |
| 23 | Earth work in excavation in Foundation in B.C. soil Lead up to 30 m and lift up to 1.50 m I/C all complete as per directed by Engineer in charge. |
| 24 | Filling of Stone Dust having P.I. less then 5 in foundation or for stabilization of sub grade I/c all completion of work. |
| 25 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) complete. CPWD Dehli Schedule of rates 2023 - 4.1.10. |
| 26 | Brick Masonary in 1:4 cement & fine sand mortar in foundation and plinth as per drawing ans as per direction in charge all complete . |
| 27 | P.C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit including all complete work etc. 11.4 MORD (iii) Specification 802, 803, 1202 and 1203 |
| 28 | Less 5% As Competitive Charge |
| 29 | Less 1% Labour Charges Please Enable Macros to View BoQ information |