| 1 | Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
| 2 | 11 Mtr long STP Poles. |
| 3 | 8.5 Mtr PCC Pole |
| 4 | CT/PT |
| 5 | Metering Cubicle |
| 6 | XLPE Cable |
| 7 | Cable Jointing Kit |
| 8 | 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any. |
| 9 | Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.) |
| 10 | 10/16/25/63 KVA T/F |
| 11 | 100/250 KVA T/F |
| 12 | Errection of following Poles including Cutting & Grouting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | Double pole complete fitting of STP/PCC Pole |
| 14 | 8.5 Mtr long pcc Poles. |
| 15 | 11/13 Mtr long STP Poles. |
| 16 | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 17 | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer. |
| 18 | Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer. |
| 19 | ACSR Weasel conductor |
| 20 | XLPE Cable |
| 21 | AB Cable |
| 22 | Fixing of Following Accessirious |
| 23 | 11 KV TPMO |
| 24 | 11 kv Fuse Set |
| 25 | 11 kv CT/PT |
| 26 | Metering Cubicle |
| 27 | 11 kv T/F Base Angle |
| 28 | Modem |
| 29 | Cable Jointing Kit |
| 30 | Providing & Fixing Different Type of clamp |
| 31 | Providing & Fixing of LT Incoming Panel |
| 32 | Providing & Fixing of Suspension Clamp |
| 33 | Providing & Fixing of Dead End Clamp |
| 34 | Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection. |
| 35 | 10/16/25/63 KVA T/F |
| 36 | 100/250 KVA T/F |
| 37 | Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. |
| 38 | Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The \\"T\\" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material. |
| 39 | Construction of plinth of size 2*2*1.5 mtr above ground level one ft below the ground level of 9\\" After Exavation of 4 \\"earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9\\"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6\\"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand. |
| 40 | Pipe earthing of 250 KVA medium Power Transformers |
| 41 | Net Fencing of 250 KVA medium Power Transformers |
| 42 | Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer |
| 43 | Dismentalling & back Cartage of 100 kva T/F Work Site to Store Centre Hathras Please Enable Macros to View BoQ information |