|
| 1 | Earth work in cutting or in embankment in ordinary soil,excation to be in the form of regular pits not exceeding 0.5m in depth etc. Asper S.I.No.-253 |
| 2 | Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. As per SI no-251.Schedule Rate |
| 3 | Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-273 |
| 4 | First class b/w in 1:4 in cement and fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of work. Asper S.I.No.305(b) |
| 5 | Supply and Laying of 125 micron Polything in betweenlean concrete and c.c slab. |
| 6 | Constrution of unreinforcement dowel, dowel jointed at expansion joint at M30 (GRADE0 Design mix as per MORD 1501 |
| 7 | 12mm thick cement plaster in 1:4 cement and sand moltar including supply of all material, labour and T&P, etc. required for proper completion of work as per SI no- 584 A. Schedule Rate for Fine sand |
| 8 | Construction joint(depth of cc slab):making and filling with construction ( with bitumin 40%,asbestus 5% and coarse sand 55%.). |
| 9 | Supply and fixing of 110mm dai PVC pipe (I>S>I Mark ) for cross drainage including all matterial labour etc at site. |
| 10 | R.C.C work with cement, aproved coarse sand and 20mm gauge aproved stone grit in the proportion of 1;2;4 in slab excluding supply of reinforcement and its bending but i/c its fixing and binding the same with 24B W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material ,labour and T.P etc.required for proper being included in the item .as per S.I No-284 |
| 11 | Mild steel or iron plain work of small and section such as holding down bolts,hold fast,tie rods grating etc (When not included in over all rates) wrought torequired from including supply of steels and its wastage including all completion work .As per S.I.No-502 |
| 12 | Supply and fixing of 20mm granite stone sign board including all for proper completion of the work |
| 13 | Lettering and painting of stone sign board including all complete at work |
| 14 | Dismantling of brick soling (B.O.E.) old brick soling i/c all completion |
| 15 | Relaying of old brick soling (B.O.E.) in carrige way i/c all completion Please Enable Macros to View BoQ information |