| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (2.8.1)-All kinds of soil. |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 3 | Providing and laying in position cement concrete in proportion of 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level : |
| 4 | Providing and laying in position cement concrete in proportion of 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for :(4.3.1) Foundations, footings, bases for columns |
| 6 | Providing and laying in position reinforced cement concrete in proportion of 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) , excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for(5.9.1)-Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls (5.9.16.1)Under 20 cm wide |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(5.22.6)-Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Arranging and spreding 75 mm thick broken grit 20 mm (Granite stone) uniform for turfing over 100mm thick base course of C.C. In 1:4:8 (1cement:4coarse sand: 8, 40mm stone ballast) top finish by brooming of cement mortar 1:4(1cement: 4 Coarse sand) including supply of all materials, labour and tools and plants etc. required for proper completion. |
| 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:(6.1.1) Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 13 | Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. |
| 14 | Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . |
| 15 | Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . |
| 16 | Same in NSI item-23 above but for auxiliary structure. (labour rate only). |
| 17 | Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only). |
| 18 | Same as above NSI item no.-26 but for auxiliary foundations.(Labour Rate) |
| 19 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 20 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.(10.25.2)In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 21 | 2.5 cm thick 1:1.5:3 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work. without base CC |
| 22 | 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) |
| 23 | 6 mm cement plaster of mix :(13.16.1)1:3 (1 cement : 3 fine sand) |
| 24 | Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position |
| 25 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :(13.62.1)Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture Please Enable Macros to View BoQ information |