| 1 | Preliminary route survey Reconnaissance Survey | Carrying out reconnaissance survey as per SpecificationorScope of work in the tender and instructions of Engineer-in-Charge and submissin of four coloured drawings and report. |
| 2 | Detailed Grid Line Survey | Carrying out detailed survey along proposed gas pipeline routes for a width of 5 m on either side as per specifications and tender document, approved route and submit digitized route drawing in 3 nos coloured prints on a scale of 1 is to 1000 along with original tracing and CAD output |
| 3 | Crossing Survey | Carry out a detailed survey for the proposed gas pipeline crossing using appropriate survey instruments, providing planimetry and ground profile details with levels at 5 m intervals |
| 4 | Crossing Survey | To carry out a detailed survey covering a proposed crossing for Gas Pipeline using survey instruments and giving Planimetry and ground profile details and levels at 5m interval |
| 5 | Permission Railway | Obtaining permission for laying gas pipeline along with OFC cable from appropriate railways authority for crossings at desired location witihn 6 months of intimation given by BPCL to bidder for applying NOC.At each crossing location, application for permission needs to be seperatey applied for pipeline (with carrier pipe) and OFC with duct. |
| 6 | Permission NH along | Obtaining permission for laying Gas pipeline along with OFC cable from apropriate NH authority for laying along the RoU of National highway within 2 months of intimation given by BPCL to bidder for applying NOC.At each crossing location, application for combined permission needs to be applied for pipeline (with carrier pipe) and OFC with duct. |
| 7 | Permission NH Crossings | Obtaining permission for laying gas pipeline along with OFC cablefrom appropriate NH authority for crossings at desired location within 2 months of intimation given by BPCL to bidder for applying of NOC. At each crossing location, application for combined permissions needs to be applied for pipeline (with carrier pipe) and OFC (with duct). For measurement purpose, at each crossing location permission so obtained for pipeline and OFC will be treated as one (single). |
| 8 | Permission SH Along | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate SH Authority for laying along the ROU of State Highway within 1.5 months of intimation given by BPCL to bidder for applying for NOC.At each crossing location, application for combined permission needs to be applied for pipeline (with carrier pipe) and OFC (with duct). For measurement purpose, payment against this line item will be paid on per Km length of highway for which approval has been obtained. |
| 9 | Permission SH Crossings | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate SH Authority for crossings at desired location within 1.5 months of intimation given by BPCL to bidder for applying for NOC.At each crossing location, application for combined permission needs to be applied for pipeline (with carrier pipe) and OFC (with duct). For measurement purpose, at each crossing location permission so obtained for pipeline and OFC will be treated as one (single).Quantity will be treated as one (1), even if separate applications are applied for Pipeline and OFC at single crossing location. |
| 10 | Permission Canal | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 1.5 months of intimation given by BPCL to bidder for applying for NOC.At each crossing location, application for combined permission needs to be applied for pipeline withorwithout carrier pipe or as desired by Authority and OFC with duct |
| 11 | Permission RiverorWater Bodies | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 1.5 months of intimation given by BPCL to bidder for applying for NOC.At each crossing location, application for combined permission needs to be applied for pipeline (withorwithout carrier pipe or as desired by Authority) and OFC (with duct). For measurement purpose, at each crossing location permission so obtained for pipeline and OFC will be treated as one (single).Quantity will be treated as one |
| 12 | Permission Major District Roads | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 1.5 months of intimation given by BPCL to bidder for applying for NOC.At each crossing location, application for combined permission needs to be applied for pipeline (withorwithout carrier pipe or as desired by Authority) and OFC (with duct). For measurement purpose, at each crossing location permission so obtained for pipeline and OFC will be treated as one |
| 13 | Permission Gram Panchayat Roads | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for crossings at desired location within 1.5 months of intimation given by BPCL to bidder for applying for NOC.At each crossing location, application for combined permission needs to be applied for pipeline (withorwithout carrier pipe or as desired by Authority) and OFC (with duct). |
| 14 | Permission State PWD Obtaining permission for laying Gas pipeline along with OFC cable | from Appropriate Authority for particular areaorlocation (as instructed by BPCL) within 1.5 months of intimation given by BPCL to bidder for applying for NOC.For measurement purpose, permission letter so obtained for the particular area for pipeline and OFC will be treated as one (single). Quantity will be treated as one (1), even if separate applicationsare applied for Pipeline and OFC. |
| 15 | Permission Development Authority | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for particular areaorlocation (as instructed by BPCL) within 1.5 months of intimation given by BPCL to bidder for applying for NOC.For measurement purpose, permission letter so obtained for the particular area for pipeline and OFC will be treated as one (single). Quantity will be treated as one (1), even if separate applications are applied for Pipeline and OFC. |
| 16 | Permission or Any Authority | Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate Authority for particular areaorlocation (as instructed by BPCL) within 1.5 months of intimation given by BPCL to bidder for applying for NOC.For measurement purpose, permission letter so obtained for the particular area for pipeline and OFC will be treated as one (single). Quantity will be treated as one (1), even if separate applications are appliedfor Pipeline and OFC. |
| 17 | Permission RoU from Land owner | Obtaining permission for laying Gas pipeline along with OFC cable from Private Land Owner for particular areaorlocation (as instructed by BPCL) within 1.5 months of intimation given by BPCL to bidder for applying for NOC.For measurement purpose, permission letter so obtained for the particular area for pipeline and OFC will be treated as one (single).Quantity will be treated as one (1), even if separate applications are applied for Pipelineand OFC. |
| 18 | Permission Municipal | Obtaining permission for laying Gas pipeline along with OFC cable from Municipal CouncilorMunicipal CorporationorMunicipal Committee for particular areaorlocation (as instructed by BPCL) within 1.5 months of intimation given by BPCL to bidder for applying for NOC.For measurement purpose, permission letter so obtained for the particular area for pipeline and OFC will be treated as one (single). Quantity will be treated as one (1), even if separate applications are applied for Pipeline and OFC. Rate will be inclusive of preperation& submission of Drawing etc. |
| 19 | Permission ProtectedorReserved Forest | Permission - ProtectedorReserved ForestObtaining permission for laying Gas pipeline along with OFC cable from Forest Department for ProtectedorReserved Forest within 8 months of intimation given by BPCL to bidder for applying for NOC.For measurement purpose, permission letter so obtained for the particular area for pipeline and OFC will be treated as one (single). Quantity will be treated as one (1), even if separate applications are applied for Pipeline and OFC.1. All range area will be considered as one. |
| 20 | Area Survey for MDPE Network | Area Survey for MDPE Network To carryout Area survey and propose a feasible route forlaying the proposed pipeline network and to identify and record all the features of the area surveyed along with building, structures, drains pavements, roads etc. and including those likely to have bearing on alignment of proposed pipeline and to propose a pipeline route with respect to plot boundary giving offset from the nearest boundary which will have least obstruction, marking obstruction, if any, identify the type of building type of road back lanes required to be cut to lay the pipelines, all the field data to be collected, superimposing the same on digitized satellite high resolution image |
| 21 | DM NOC for setting up of CNG stationorDCU | DM NOC for setting up of CNG stationorDCUorany other CGD facility. |
| 22 | The work involves updating BPCL ownership details in the land revenue records | The work involves updating BPCL ownership details in the land revenue records for all relevant plots, including those acquired from KIADB, Nagar Nigam, private parties, and others. The scope includes collection of the updated Khasra documents and submission of the same to BPCL. The revenue maps corresponding to the respective survey numbers shall be updated to clearly demarcate the plots owned by BPCL |
| 23 | Obtain NOC or Leaseorpermission from local Govt. Authorities | Obtain NOCorLeaseorpermission from local Govt.Authorities including building permission Munciple Corporation and Developing Authority for allocation of land for DRS. |
| 24 | Drilling bore holes | Drilling through rockorboulder strata where SPT value is greater than 100 with minimum Nx size bit up to a depth of 10mfrom Existing Ground or Bed Level as per instruction of Engineer-in-charge on Plots |