| 1 | fo|qr forj.k [k.M&eksnhuxj ds dk;Z{ks= esa iw.kZ tek ;kstuk ds vUrxZr fuos'k fe=@>ViV iksVZy ij vkosnukuqlkj la;kstu fuxZr djus gsrq ykbZu fuekZ.k vkfn dk;ZA |
| 2 | Carriage of followings from ESC. Gzb to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required for proper completion of work, distance about to 60 Kms. |
| 3 | S.T Pole 13 Mtr. Long |
| 4 | PCC Pole 11 Mtr. Long |
| 5 | S.T. Pole 11 Mtr. Long |
| 6 | PCC Pole 8.5 mtr Long. |
| 7 | Carriage of All Centralized/De-Centralized line Material from Store Center Gzb to JE Store Sub Station as ACSR Weasel Conductor, ABC Conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator, XLPE Cable,HDPE Pipe etc. |
| 8 | Erection of Single Pole support including complete 1 IT fittings as per RESSPO manual and as per direction of Engineer in charge including the Cost of Labour, T&P and Carrier etc. required for proper Completion of Work. |
| 9 | S.T Pole 13 Mtr. Long |
| 10 | PCC Pole 11 Mtr. Long |
| 11 | S.T Pole 11 Mtr. Long |
| 12 | PCC Pole 8.5 mtr Long. |
| 13 | Erection of Double Pole/Saction Pole support including complete 1 IT fittings as per RESSPO manual and as per direction of Engineer in Charge including the Cost of Labour, T&P and Carrier etc. required for proper Completion of Work. |
| 14 | S.T. Pole 13 Mtr. Long |
| 15 | PCC Pole 11 Mtr. Long |
| 16 | S.T. Pole 11 Mtr. Long |
| 17 | PCC Pole 8.5 mtr Long. |
| 18 | Grouting of Single support shall be Grouted with Cement, Sand and Brick Ballast/Stone Ballast in ratio 1:4:8 =30x3030 cms, including the Cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESSPO manual and as per Direction of Engineer in charge including the Cost of Labour, T&P and Carrier etc. required for proper Completion of Work. |
| 19 | S.T Pole 13 Mtr. Long |
| 20 | PCC Pole 11 Mtr. Long |
| 21 | S.T Pole 11 Mtr. Long |
| 22 | PCC Pole 8.5 mtr Long. |
| 23 | Grouting of Double Pole support shall be grouted with Cement, Sand and Brick Ballast/Stone Ballast in ratio 1:4:8 =30x3030 cms. including the Cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESSPO manual and as per Direction of Engineer in charge including the Cost of Labour, T&P and Carrier etc. required for proper Completion of Work. |
| 24 | S.T. Pole 13 Mtr. Long |
| 25 | PCC Pole 11 Mtr. Long |
| 26 | S.T. Pole 11 Mtr. Long |
| 27 | PCC Pole 8.5 mtr Long. |
| 28 | Carriage of All Centralized/De-Centralized line Material from J.E store Sub station to Pit Site ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator, XLPE Cable, HDPE Pipe etc. |
| 29 | Cutting/Drilling/Welding of MS Angle Iron for making Guarding Angle Size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST Pole for Construction of the Line. |
| 30 | Carriage of 11 Kv CT/PT metering polemounted unit varius ratio. |
| 31 | Carriage and Installation of 11 KV Pilfer-Resistant Metering Cubicle with out Cable Termination Kit. |
| 32 | Mounting of 11 KV CT/PT unit various ratio. |
| 33 | Making/Filling of 11 KV Cable Jointing Kit varius size XLPE Cable. |
| 34 | Loading/Unloading & Carriage of T/F from ESC. Gzb to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required for proper Completion of Work, Distance about to 60 Kms. |
| 35 | 10/25/63 KVA T/F |
| 36 | 100 KVA T/F |
| 37 | 250 KVA T/F |
| 38 | Fixing of 11 KV Stay Rod with Stay Wire in proper way with Nozelling. |
| 39 | Grouting of 11 Kv Stay Rods. |
| 40 | Guarding of 11 KV Line. |
| 41 | Laying, Sagging, Stringing and Binding and Jumpering of overhead 11 KV XLPE Cable 3*70 Sq. mm. & Other Size newly erected pole as per RESSPO Manual and as per Direction of Supervising Engineer. It includes the Cost of Labour, T&P, Carrier etc. required for proper Completion of Work. |
| 42 | 11 KV XLPE Cable 3*70 Sq. mm. |
| 43 | 11 KV XLPE Cable 3*120 Sq. mm. |
| 44 | 11 KV XLPE Cable 3*185 Sq. mm. |
| 45 | Laying, Sagging, Stringing and Binding and Jumpering of ACSR Weisal, Rabbit, Dog newly erected pole as per RESSPO Manual and as per Direction of Supervising Engineer. It includes the Cost of Labour, T&P, Carrier etc. requried for proper Completion of Work. |
| 46 | ACSR Weisal Conductor |
| 47 | ACSR Rabbit/Dog Conductor |
| 48 | ABC Cable 3*50 Sq. mm. |
| 49 | ABC Cable 3*95 Sq. mm. |
| 50 | ABC Cable 3*120 Sq. mm. |
| 51 | Fixing of Earthing Rod |
| 52 | Fixing of PIN Insulator |
| 53 | Fixing of Distribution Box. |
| 54 | Fixing DISC Insulator |
| 55 | Fixing of X-Arm/ T-off Channel |
| 56 | Fixing of Top/ Drop Channel |
| 57 | Fixing of Sub-station Angle. |
| 58 | Fixing of Fuse Set. |
| 59 | Transfomer Plinth. |
| 60 | Fencing of TF |
| 61 | Providing of GI Pipe for Cable Double Pole. |
| 62 | Fixing of GI Pipe for Cable Double Pole. |
| 63 | Providing of HDPE Pipe for 11 KV Cable off Size |
| 64 | Fixing of HDPE Pipe for 11 KV Cable off Size |
| 65 | Providing of Interconnecting 6 Mtr Long Pieces of HDPE Pipe Socket |
| 66 | Fixing of Interconnecting 6 Mtr Long Pieces of HDPE Pipe Socket |
| 67 | Digging of Pits of Size of Cable Loops 4*4*1.5 for Cable Loop |
| 68 | Restoration of Pits after Laying of Cable Loops |
| 69 | Digging of Cable Trench for all Type Cable Laying |
| 70 | Restoration of Kaccha Road after laying of Cable |
| 71 | Making Jumpers on Section Points by Fixing of Proper Sizes, Suitable for ACSR Weasel Conductor, Section Double Pole. |
| 72 | Providing & Fixing Chemical Earthing of Distribution Transformer and proper Completion of work as per RESSPO Manual. |
| 73 | Road Broken/Trench Digging with the help Road Cutter/Digging Machine/Tractor etc. |
| 74 | Change of Broken/Damage/ Missing Following Items:- |
| 75 | Ressagging of Loose & Bad Sag of LT/HT Line. |
| 76 | Tightening of Stay |
| 77 | Alignment of PCC/STP Pole |
| 78 | Grouting of Old PCC/STP Pole |
| 79 | Chopping of Tree Branches |
| 80 | Dismentalling of STP/ PCC Pole |
| 81 | Removal of STP/ PCC Pole |
| 82 | Dismentalling/ Removal of existing Meter Cubicle/CT & PT. |
| 83 | Removal of Old And Used ACSR Weasel Conductor & Opening from Insulator & Binding the Same. |
| 84 | Dismentalling & Removal of Old & Used T/F and Opening of All Accessories. |
| 85 | 25/63/100 KVA T/F |
| 86 | 250/400 KVA T/F |
| 87 | Cartage of Old & Used STP/PCC from site of work to Store Center with loading & Unloading at Both End. |
| 88 | Cartage of Old & Used 25/63/100 KVA T/f from site of work to Store Center with loading & Unloading at Both End. |
| 89 | Cartage of Old & Used Meter Cubicle/ CT/PT from site of work to Store Center with loading & Unloading at Both End. |
| 90 | Cartage of Removal Old & Used ACSR Weasel Conductor from site of work to Store Center with loading & Unloading at Both End. |
| 91 | Mounting & Installation of T/F From D/P |
| 92 | 10/16 KVA T/F |
| 93 | 25 KVA T/F |
| 94 | 63 KVA T/F |
| 95 | 100 KVA T/F |
| 96 | Disconnecting the Connection before starting the work and reconnecting it to the after Completion of the work per Unit. |
| 97 | The following material is required to be supplied by the Contractor. |
| 98 | Providing & Fixing Holding Clamp. |
| 99 | Provoding & Fixing Barbed Wire |
| 100 | Provoding & Fixing of Danger Board with Clamp & Nut Bolt |
| 101 | 11 KV Cable Jointing Kit Various Size XLPE Cable |
| 102 | Providing of Distribution Box. |
| 103 | Providing of LT Lead 1*16 Sq. mm. |
| 104 | Providing of LT Lug 1*16 Sq. mm. |
| 105 | Fixing of LT Lead 1*16 Sq. mm. |
| 106 | Fixing of LT Lug 1*16 Sq. mm. |
| 107 | Providing & fixing of Double Pole Clamp. |
| 108 | Providing & Fixing of F Bracket |
| 109 | Providing & Fixing of LT Clamp |
| 110 | Providing & Fixing PG Clamp |
| 111 | Providing & Fixing J-Hook |
| 112 | Providing & Fixing Earth Clamp |
| 113 | Providing & Fixing TF Clamps. |
| 114 | Providing & Fixing Stay Clamp |
| 115 | Providing & Fixing Dead & Clamps |
| 116 | Providing & Fixing 11 KV Stay Insulator |
| 117 | Providing & Fixing Suspension Clamps |
| 118 | Providing & Fixing LT Insulator |
| 119 | Providing & Fixing Side Bracket |
| 120 | Providing & Fixing Alimunium Binding Wire |
| 121 | Providing & Fixing Alimunium Tape |
| 122 | Stone Pad |
| 123 | Fixing of Stone Pad |
| 124 | Providing & Fixing of Nut & Bolt off Size. Please Enable Macros to View BoQ information |