| 1 | Dismantling of following type of road surfaces for laying of pipe line and house connection work including sorting out of serviceable materials and disposal of unserviceable materials. |
| 2 | Interlocking Tiles Road |
| 3 | Excavation for pipeline in ordinary soil (loam, clay, sand) with lift up to 1.5 m and lead up to 50 m and including filling back, watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth within 50 meters.0 to 1.5 m depth |
| 4 | Supply of ISI mark DI K-9/K-7 S&S pipes (push on joints) of following class and diameters inclusive of jointing material (Rubber gasket of EPDM Quality, Bend, Tee etc.) including all statutory duties and taxes, third party inspection charges, transit insurance, freight,transportation to store/ site of work, unloading, stackingetc. complete as directed by Engineer –in-charge.150 mm nominal dia pipe(K-7) |
| 5 | Fabrication & making Specials for pipe line tee reducer & Small pieces of pipe to cut in required size in all complete. 10% of supply |
| 6 | Carting, lowering, laying and jointing with SBR ruber gaskets D.I. K-9/K-7 pipes of following dia & pressure including all specials, to site of work, lowering them into trenches, laying true to alignment and gradient, in proper position, cutting of pipes, making of joints including cost of jointing materials and rubber rings, labour, T&P, including hydraulic testing etc. complete as directed by Engineer in-charge.150 mm nominal dia pipe |
| 7 | Supply of following type of valves as per specifications F.O.R. desination rates per meter (exclusive of GST) in Rs. every where in UP upto stores of consignees inclusive of third party inspection charges, packing and forwarding charges, transit insurance charges, road transportation charges, unloading & stacking the same etc. complete. |
| 8 | 150 mm |
| 9 | Carting, lowering, laying, aligning, fixing in position and installation of following valves in pipe line including all material, labour, testing and commissioning as perdirection of Engineer-in- charge. |
| 10 | 150 mm dia |
| 11 | Supply of all materials, labour, T&P etc. required for construction of following masonry type chambers as per type design.Construction of a masonry chamber 1200X1200X1000 cm inside size with cover, all complete |
| 12 | Supply of all materials, labour, T&P etc. required for construction of following masonry type chambers as per type design.Construction of a masonry chamber 600x600x750 cm inside size with cover, all complete |
| 13 | Provision for crossing of Nalas (0.5m to 2.0 m width) for laying of pipe line including necessary specials, T&P and arrangement of diversion of water, baricatings etc required, with dismantling of drains and reconstruction of same as per type design of the existing drain. |
| 14 | 1.0 - 1.5 m (Clear Span) |
| 15 | 1.0 - 1.5 m (Clear Span) |
| 16 | Disposal of surplus earth and other similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, etc complete required for proper completion of the work. |
| 17 | Reinstatement of following type of road surfaces after laying of pipe line and house connection work including supply of all materials, T&P etc. required for proper completion of the work as per direction of engineer-in-charge. The quantity of reinstatement has been increased by thirty percent in the view of additional damaged of dismantled road due to traffic / vehicle movement. |
| 18 | C.C. Interlocking Tiles Road Type AConstruction of C.C. Interlocking Tile road including supply of all materials, labour, T&P etc. required for proper completion of work as per following thickness:-PCC = 100 mm,1:4:8 (cement, coarse sand & stone ballast of 20-40 mm)Sand = 30mm to 50mm thick local sand lair for preparation of surfaceTiles = 50% new + 50% oldNote : 100 mm thick rubber moulded interlocking tile shall be used for construction of interlocking tile road. |
| 19 | Installation of product pipe by Auger Boring method including making of entry and exit pits upto 3 mtr depth, all related civil works like excavation, horing/strutting, etc., shielded excavation through auger boring process, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit and after project completion as per the instructions of the Engineer-in-Charge all complete except the cost of the pipe. (upto 80 meter installation length)Upto 300 mm dia |
| 20 | P&F of Inauguration stone Board in all complete |
| 21 | Add 18% GST Please Enable Macros to View BoQ information |