Name of Work:- OPERATION AND MAINTENANCE OF AIR POLLUTION CONTROL DEVICES CONNECTED WITH FURNACE NO – 1& 2 AND 3& 4 AT NEW COMPLEX OF NIMTALA BURNING GHAT.
Sl. No.
Item Description
1
Engagement of three (03) number skilled workers having ability of fault- finding, minor repairing of electro-mechanical system, water circuit and slurry dischargearrangements for operation of Air Pollution Control Device in three shifts (including damper & I.D fan operation)(As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025).
2
Proportionate Casual Leave imposed as per Mpl. Secretary's CircularNo.23 of 2012-13 dt.10.12.2012 vide the MIC Item No.M 39.7dt.14.08.2012. adding the total wages amount 4.53%.
3
Engagement of a Reliever for operators (Skilled category) in the weekly off-Days (As per Mpl. Secretary's Circular No. 06 of 2025-26 dt. 24.07.2025).Total nos. of off-days for an operator in a year = 52 nos.Total off -days for three (03) nos. operators = (52 X 3) nos. = 156 nos.Total working days for Relieve throughout year = 156 Days
4
Labour charges for monthly as per directed by EIC, removing the carbon and particle/sludge arrested by Ceramic Saddles (3000 Nos. per stage for two stages for total of 6000 Nos.) from the Precooler and cleaning of the same in two stages. Two nos. of stainless-steel strainer /net to be cleaned by way of high-pressure jet pump and by scrubbing hammer manually. (Precaution to be taken for fresh air circulation during cleaning inside)
5
Labour charges for monthly as per directed by EIC, opening the two doors of mist eliminator by unscrewing 60(sixty) nos. nut and bolt and drawing out two nos. strainer. Cleaning the strainers by using scrubbing hammer and highpressure jet pump. Strainers to be fitted in proper position inside Mist Eliminator and closing the two doors and fitting 60 nos. nut and bolts.
6
Labour charges for monthly as per directed by EIC, cleaning of Blower by opening the inlet hub and removing canvas cloth. The deposited carbon from inside the blower to be cleaned manually and by high-pressure jet pump. After cleaning the inlet hub to be refitted and canvas cloth to be re wrapped.
7
Labour charges for monthly as per directed by EIC, chimney door to be unscrewed and deposited carbon particles are to be manually removed from inside the Chimney Base and washed with water. Removed Carbon particles tobe packed up in gunny bags and dropped at the departmental Vat. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.