| 1 | Providing ordinary labours engaged for site clearance, Bush clearance etc. |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M including all lifts levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). 5.1.10 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) 5.3.1.4 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). (B.C.D 5.3.1.1). (B.C.D 5.3.1.1) |
| 6 | Providing centering and shuttering including struting proping etc. and removal of form for foundation, footings, basages of columns etc. for mass concrete. (5.3.17.1) |
| 7 | Construction of sub-grade and earthen shoulder with approved material obtained from Borrow pit with approved material obtained from borrow pits with all lift and and leads,transporting to site,spreading,grading to required slope and compacting to meet requirement of Table 300-2. 3.18( flank filling) |
| 8 | (a) Cement (lead 10 km) |
| 9 | (b) Sand (25 p) km |
| 10 | (c) Stone Chips (lead 26 km) |
| 11 | (d) Stone Metal (lead 26 km) |
| 12 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M including all lifts levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. 5.1.1+5.1.2 |
| 13 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per buy lading specification and direction of E/I (Mode of measurement compacted volume).5.1.10 |
| 14 | Providing designation 75 B one brick flat soling b/f/s do-do-E/I 5.6.3 |
| 15 | Providing and laying in position Reinforced cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) -- do-- E/I.5.3.9.1 |
| 16 | Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete.5.3.4 |
| 17 | Providing 12mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.5.7.2+5.7.11 |
| 18 | Centering and shuttering including strutting,propping etc and removal of form work for mass concrete do-do-E/I5.3.17.1 |
| 19 | Providing tor steel reinforcement of 10mm, 12mm & 16mm dia bars as per approved deign and drawing as per building specification and direction of E/I (a) 10mm (TMT coil Fe 500) (only valid for TATA(Tucson), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (b) 12mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (c) 16mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (a) 8 mm dia rod 5.5.4 |
| 20 | Providing tor steel reinforcement of 10mm, 12mm & 16mm dia bars as per approved deign and drawing as per building specification and direction of E/I (a) 10mm (TMT coil Fe 500) (only valid for TATA(Tucson), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (b) 12mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL) (c) 16mm (TMT coil Fe 500) (only valid for TATA(Tiscon), SAIL, JSPL, Elcetrosteel Ltd. Bokaro and Vizag(RINL)(a) 10 mm dia rod 5.5.5. |
| 21 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) 5.1.7 |
| 22 | Carriage of material Sand (AVG Lead 20 Km.(P)) |
| 23 | Stone Chips (AVG Lead 20 Km.(P)) |
| 24 | Bricks (AVG lead 08 km (p)) |
| 25 | Cement + Rod (AVG Lead 02 Km.(P)) |
| 26 | Add cost for Signboard and Photography |
| 27 | Goods & Service Tax (G.S.T. 18%) |
| 28 | 1% Labour Cess Please Enable Macros to View BoQ information |