| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50M including all lift leaving ramming the foundation trenches removing roots of tress shruds all complete as per approved design, building specification and direction of E/l. |
| 2 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). |
| 3 | Proving coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete job as per building specification and direction of the E/I. |
| 4 | Providing designation 75-B one Brick flat soiling jonts filed with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Providing 75B designation Brick work in C.M (1:6) in foundation and plinth with approved quality of clean coarse and of F.M 2 to 2.5 including providing 10mm thick mortar joints cost of screening materials raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/l. |
| 7 | Providing designation 75B Brick work in CM (1:6) in superstrcture with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints costs of screening, matrials scaffoling, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/l. |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).ROOF BEAM |
| 10 | Providing Toe steel reinforcement of 8mm dia to 10mm dia rods as approved design and drawing excluding carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (Only Valid for SAIL & TATA STeel) |
| 11 | Providing Toe steel reinforcement of 12 mm dia to 32 mm dia rods as approved design and drawing excluding carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. 12 mm to 32 mm dia (TMT coil Fe 500) (Only Valid for SAIL & TATA Steel) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form forWeather shade, Chajjas, corbels etc., including edges |
| 17 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royality all complete as per building specification and direction of E/I |
| 18 | Providing 6mm thick cement plaster (1:4) in ceiling with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scafolding taxes and royalty all complete as per buildings specification and direction of E/I. |
| 19 | Providing 19 mm thick water proof cement plaster (1:3) with clean coarse sand of F.M. 1.5 with 5% cico or any other approved water proofing compound including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete |
| 20 | . Providing two coat of snowcem of approved shade and make over a coat cement primer on new surface ………………………all complete job. |
| 21 | Providing 50 mm thick first class patent stone flooring (1:2:4) with stone chips in two layers, bottom layer 19mm thick (1:2:4) with 12 mm to 6mm size graded stone chips and top layer 6 mm thick (1:2:4) with 6mm down stone chips, in panels including cost of curing, finishing the surface smooth by rubbing with carborandum stone, taxes and royalty with all complete as per building specification and direction of E/I |
| 22 | Providing 12 mm thick cement plaster (1:3) with 1.5 mm neat cement punning screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete |
| 23 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20mm nominal size ) over 75mm bad by dry brick ballast 40mm nominal size well rammend and consolidated and grouted with fine sand including finishing the top smooth. |
| 24 | Providing 250mm. Wide brick drain in cement mortar (1:6) with av. 150mm clear depth and 250mm apron including cost of eartwork involved with 75mm cement concrete (1:4:3) over one brick designation 75A flat soling in proper grade and slope at the base the drain duly plastered in C.M. (1:3) with punning over exposed surface all complete as per building specification and direction of E/I. |
| 25 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc,filling the joints with sand and cutting of paver blocks as per requiredsize and pattern, finishing and sweeping extra sand. complete all asper direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern |
| 26 | Providing & laying P.C.C. M-200 with nominal mix of (1:1.5:3) in road embankment with stone Chips ..do..do…all.. Comp. as per specification and direction of E/I |
| 27 | Takind down C.A or G.C.I sheet roofing with riged inclluding staking the seeviceable material do..do..all |
| 28 | Dismantling R.C.C. work including stacking serviceable materials in cuuntable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 29 | Dismantling patent stone floor including stacking serviceable serviceable materials in cuuntable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 30 | Takind down wooden beam rafter building frams etc. inclluding staking the seeviceable material do..do..all |
| 31 | Dismantling pucca brick work including stacking serviceable serviceable materials in cuuntable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. |
| 32 | Carriage of materials from nearest approved sources of supply including loading into trucks and unloading from truck and stacking properly at work site etc. all complete job as per direction of E/I Bricks Lead |
| 33 | Sand lead |
| 34 | Stone chips lead |
| 35 | cement & steel |
| 36 | G.S.T @ 18% |
| 37 | Labour Cess 1% Please Enable Macros to View BoQ information |