| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.(Code no-2.6.1) |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)(Code No. 4.1.2) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)(Code No. 4.1.8) |
| 4 | Centering and shuttering including strutting, propping etc.& removal of form for Foundations, footings, bases of columns, etc. for mass concrete(Code No. 5.9.1) |
| 5 | Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work.(CSI No. 9.14) |
| 6 | Fixing and grouting 25 mm and below dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15) |
| 7 | Fixing of template in position level and alignment for grouting of Anchor bolt in auxiliary structure. (labour rate only). (CSI No. 9.32) |
| 8 | Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18) |
| 9 | 6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)(Code no13.16.1) |
| 10 | Neat cement punning.( Code No 13.18) Please Enable Macros to View BoQ information Special Condition :- |
| 11 | Tenderer are required to quote their offer as above / at par / below in estimated cost. |
| 12 | The rates are to be filled up in figures and words both. |
| 13 | The offer rates shall remain firm (not variable) for entire execution period. |
| 14 | Departmental rates are exclusive of GST. Rates quoted by firm shall exclude GST which will be borne by department as per applicable rules. |
| 15 | In case of any discrepancy between the language of the items of bill of quantity and that of PWD the later shall prevail. |
| 16 | Tenders are advised to visit the site of work and make themselves acquainted with the site conditions. No claim whatsoever shall be entertained after submission of tender. |
| 17 | After awarding / allotting the tender to L-1 by Committee the Contractor have to deposit the performance guarantee security amount for doing agreement. |
| 18 | All above works shall be executed as per U.P.P.W.D/ U.P.P.T.C.L. specification or as directed by Engineer-In-charge. |
| 19 | The work may be carried in energized s/s area having high voltage installations contractor must employee trained Supervisor & Labour to work in such electrical hazardous area. All risk to men & materials shall be contractor’s responsibility. |
| 20 | All materials shall be arranged by the contractor’s at his own cost. |
| 21 | No handling charges of T&P and labour will be paid for extended period of contract, if any. |
| 22 | Rates quoted by Tenderer will remain firm till completion of scope of work of contract. |
| 23 | Contractor shall register his labour engaged in construction work in the office of Dy. Labour Commissioner ¼Hkou ,oa vU; lfUuekZ.k deZdkj ¼fu;kstu rFkk lsok ‘krZ fofu;eu½ vf/kfu;e 1996. |
| 24 | MS Scrap received against dismantled RCC/RB work will be issued to the contractor as per current departmental approved rate. |
| 25 | Brick bats recovered against dismantled brick work will be issued to the contractor @ Rs. 1103.00/Cum. |
| 26 | Testing of material if any, required expenditure shall be borne by the contractor. Nothing shall be paid extra by the department. |
| 27 | Contractor has to made available 12 No cube at site and will frequently fill the cube at site. Accordingly cube test report will be submitted by contractor at his own cost. Final bill of work will be paid to contractor only after he will submit all satisfactory test result from authorized lab. |
| 28 | The contractor should have all related T&P like as concrete mixture, Needle & Surface vibratory, Slump test equipment & survey equipment etc. |
| 29 | Contractor has to put up all relevant drawing to SE (Civil) Prayagraj for approval at his own cost; nothing shall be paid extra for it. |
| 30 | As per G.O No. 622/23-12-2012-2. Audit/08 TC dt. 08 June 2012, Contractor has to deposit extra Security/ Performance guarantee, if the tendered rates are found below to the department rates. |
| 31 | As per section 171 of CGST Act, 2017 Any reduction in rate of tax on any supply of goods or service or the benefit of input tax credit shall be passed on the recipient by way of commensurate reduction in prices. Hence supplier/manufacturer to ensure to pass the benefit of reduced prices to UPPTCL, Further price quoted by supplier/Manufacturer is subject to scrutiny under above section” |
| 32 | Security of work will be released after six month from the date of completion of the work if no defect has been found after six month. |
| 33 | Only in case of non availabulity of departmental water supply, the contractor will make own arrangements, However, in case of departmental water supply 1.5% deduction will be made from contractor’s bill for water charges for the item which involve water consumption. |
| 34 | The bill Processing / Payment will be done according to existing ERP System. The contractor should registered his firm on ERP System for Vender Id at his own Cost. |
| 35 | If Tender has been cancelled after inviting due to any reason between tender call to final process, the tender cost will not refund to contractor, only EMD Will be refunded to Firm. Name ……………………………..………..... Full Postal Address:………………………. ………………………………………………….. Phone No……………….. Mob. No………… |