| 1 | Item Description/ Heading |
| 2 | A) FOR 4-Pit Central Balihari LT O/H line maintenance - Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 3 | Dismantle of pole (CPWD SOR' 2012, P-40, 12.42) |
| 4 | Transportation of dismantled pole from site to store |
| 5 | Transportation of pole from store to site |
| 6 | Erection of metallic pole of 8 to 10 metre length (CPWD SOR' 2012, P-36, 11.3.3) |
| 7 | Fabrication & erection of bracket & clamps |
| 8 | Supply & Erection of M.S Nut & Bolts |
| 9 | Supplying and erection of 100 mm X 110 mm shackle insulators (CPWD SOR' 2012, P-39, 12.17) |
| 10 | Erection of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 11 | B) FOR G.T feeder 11 KV O/H line maintenance -Transportation of Pole at site |
| 12 | Erection of metallic pole of 10 to 12 metre length (CPWD SOR' 2012, P-36, 11.3.4) |
| 13 | Fabrication & erection of bracket & clamps |
| 14 | Supply and erection of MS Nut & Bolts |
| 15 | Supply & erection of 11 KV Disc insulator (CPWD SOR' 2012, P-42, 13.11) |
| 16 | Supply & erection of 11 KV Pin insulator (CPWD SOR' 2012, P - 42, 13.10) |
| 17 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 18 | Making new jumper with O/H line |
| 19 | Making new jumper with O/H line for back feed to Patch-B |
| 20 | Dismantle of jumper from O/H line |
| 21 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 22 | Transportation of cable 240 sq mm 30 mtrs from Regional store |
| 23 | Laying/Hanging of two nos PVC insulated power cable of 240 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) 30 + 150 = 180 mtrs |
| 24 | Supplying and making straight through cable jointing with cast resin compound (CPWD SOR' 2012, P-34, 10.3.3) |
| 25 | Supplying and making outdoor cable end jointing with cast resin compound, including lugs and other jointing materials, for 240 sq mm size (CPWD SOR' 2012, P-34, 10.2.3) |
| 26 | Supplying and making outdoor cable end termination with heat shrinkable jointing kit complete (CPWD SOR' 2012, P-35, 10.5.3) |
| 27 | Opening jumper for searching faults & after megguring re-jumpering |
| 28 | Jumper dismantle of BCW for Patch-B power supply |
| 29 | Tree & branches cutting below O/H line (Semi Skilled) |
| 30 | Damage & weak jumper repairing with binding wire etc. |
| 31 | Opening burnt cable jumper from O/H line |
| 32 | Taking down of one no. PVC insulated power cable of 11 KV grade of 185 sq mm for making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 33 | Excavation of one no. PVC insulated and PVC sheated/XLPE power cable of 11 KV grade of 185 sq mm from ground (CPWD SOR' 2012, P-28, 8.1.2) |
| 34 | Supplying and making outdoor cable end jointing with cast resin compound, including lugs and other jointing materials, for 185 sq mm size (CPWD SOR' 2012, P-34, 10.2.3) |
| 35 | Laying/Hanging of one no. PVC insulated power cable of 185 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 36 | Jumpering above cable after pole mounting with O/H line |
| 37 | Opening jumper for changing of faulty Disc insulator |
| 38 | Making jumper after changing faulty Disc |
| 39 | C) FOR main feeder from 132 KV S/S 11 KV O/H line maintenance - Erection of cradle guard with 8 no. G.I wire |
| 40 | Opening jumper for searching faults & after megguring re-jumpering |
| 41 | Opening jumper for changing of faulty Disc insulator |
| 42 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 43 | Supply & erection of 11 KV Disc insulator (CPWD SOR' 2012, P-42, 13.11) |
| 44 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 45 | Making jumper after changing of faulty Disc |
| 46 | Damage & weak jumper repairing with binding wire etc. |
| 47 | Tree & branches cutting below O/H line (Semi Skilled) |
| 48 | D) FOR Shifting of S/S work - Transportation of pole at site |
| 49 | Erection of metallic pole of 8 to 10 metre length (CPWD SOR' 2012, P-36, 11.3.3) |
| 50 | Fabrication and erection of bracket & clamps |
| 51 | Supply and erection of MS Nut & Bolts |
| 52 | Supplying and erection of 100 mm X 110 mm shackle insulators (CPWD SOR' 2012, P-39, 12.17) |
| 53 | Supplying and erection of Stay set complete (galvanised) (CPWD SOR' 2012, P-41, 13.1) |
| 54 | Erection of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 55 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 56 | Making new jumper with O/H line |
| 57 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 58 | Road cutting for laying pipe to pass cable from the pipe with hilty machine fair |
| 59 | Tree & branches cutting below O/H line (Semi Skilled) |
| 60 | Laying/Hanging of three nos PVC insulated power cable of 240 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) 40 + 40 + 40 = 120 mtrs |
| 61 | Supply & making indoor cable end jointing including lugs and other jointing materials for 240 sq mm (CPWD SOR' 2012, P-34, 10.1.3) |
| 62 | Laying/Hanging of three nos PVC insulated power cable of 11 KV grade of 120 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.1) 30 + 30 + 30 = 90 mtrs |
| 63 | Laying/Hanging of two nos PVC insulated power cable of 11 KV grade of 70 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.1) 40 + 30 = 70 mtrs |
| 64 | Supply & making indoor cable end jointing including lugs and other jointing materials for 70 sq mm (CPWD SOR' 2012, P-34, 10.1.1) |
| 65 | Electrical cable joint with lugs, HT Tape & other jointing materials |
| 66 | E) FOR Store work - Transportation of Dog conductor (1000 + 1000 + 500 mtrs in 3 days) from Regional Store 5 heads * 3 days = 15 heads |
| 67 | Iron cutting by grinder for making bracket & clamps |
| 68 | Transportation of 40 mtrs 240 sq mm cable from regional store |
| 69 | F) FOR 3.3 KV Office O/H line maintenance - Damage & weak jumper repairing with binding wire etc. |
| 70 | Tree & branches cutting below O/H line (Semi Skilled) |
| 71 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |