| 1 | Item Description/ Heading |
| 2 | A) FOR 6 No. feeder 6.6 KV O/H line maintenance -Damage & weak jumper repairing with binding wire etc. |
| 3 | Dismantle of burnt cable joint from switch & jumper from O/H line 3 + 3 = 6 nos |
| 4 | Supply & making indoor cable end jointing including lugs and other jointing materials for 185/240 sq mm with Switch by compound and other materials (CPWD SOR' 2012, P-34, 10.1.3) |
| 5 | Opening jumper for searching faults & after megguring re-jumpering |
| 6 | Opening jumper for changing of faulty Disc insulator |
| 7 | Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 8 | Supply & erection of 11 KV Disc insulator for O/H line with galvanised insulator fittings, bolts, nuts, washers etc. as required (CPWD SOR' 2012, P-42, 13.11) |
| 9 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 10 | Making new jumper with O/H line after changing faulty Disc |
| 11 | Dismantle of faulty AB Switch |
| 12 | Fabrication & erection of bracket & clamps |
| 13 | Supply and erection of M.S Nut & Bolts |
| 14 | Erection of AB Switch on pole |
| 15 | Taking down of one no. PVC insulated power cable of 11 KV grade of 185/240 sq mm for making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 16 | Laying/Hanging of one no. PVC insulated power cable of 185/240 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 17 | Supplying and making outdoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for following size of 3 core, XLPE aluminium conductor cable of 11 KV grade (CPWD SOR' 2012, P-35, 10.5.3) |
| 18 | Tree & branches cutting below O/H line |
| 19 | B) FOR Sri Nagar LT O/H line maintenance - Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (CPWD SOR' 2012, P-40, 12.40) |
| 20 | Dismantle of pole/street light standard/strut embedded in cement concrete foundation etc. as required (CPWD SOR' 2012, P-40, 12.42) |
| 21 | Transportation of dismantle pole |
| 22 | Transportation of Pole at site |
| 23 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 24 | Erection of metallic pole of 12 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) (CPWD SOR' 2012, P-36, 11.3.4) |
| 25 | Fabrication & erection of bracket & clamps |
| 26 | Supply & erection of M.S Nut & Bolts |
| 27 | Supplying and erection of 100 mm X 110 mm shackle insulators with G.I bolts, nuts, and straps etc. as required (CPWD SOR' 2012, P-39, 12.17) |
| 28 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 29 | Making new jumper with O/H line |
| 30 | Crane for erection of 12 mtr 3 nos pole in conjusted colony houses |
| 31 | Laying/Hanging of one no. PVC insulated power cable of 185 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.2) |
| 32 | Supplying and making outdoor cable end jointing with cast resin compound, including lugs and other jointing materials, for 185 sq mm size of 3 core, XLPE Aluminium conductor cable of 11 KV grade (CPWD SOR' 2012, P-34, 10.2.3) |
| 33 | Supply & making indoor cable end jointing including lugs and other jointing materials for 185 sq mm with Switch by compound and other materials (CPWD SOR' 2012, P-34, 10.1.3) |
| 34 | Damage & weak jumper repairing with binding wire etc. |
| 35 | Tree & branches cutting below O/H line |
| 36 | C) FOR 2 No. LT O/H line maintenance - Dismantle of pole/street light standard/strut embedded in cement concrete foundation etc. as required (CPWD SOR' 2012, P-40, 12.42) |
| 37 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 38 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 39 | Tree & branches cutting below O/H line |
| 40 | D) FOR 3 No. LT O/H line maintenance - Dismantle of pole/street light standard/strut embedded in cement concrete foundation etc. as required (CPWD SOR' 2012, P-40, 12.42). |
| 41 | Transportation of pole at site |
| 42 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 43 | Fabrication & erection of bracket & clamps |
| 44 | Supply and erection of M.S Nut & Bolts |
| 45 | Supplying and erection of 100 mm X 110 mm shackle insulators with G.I bolts, nuts, and straps etc. as required (CPWD SOR' 2012, P-39, 12.17) |
| 46 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 47 | Damage & weak jumper repairing with binding wire etc. |
| 48 | E) FOR 10 No. LT O/H line maintenance - Dismantle of cable jumper from O/H line |
| 49 | Taking down of one no. PVC insulated power cable of 1.1 KV grade of 70 sq mm for making fresh lead (CPWD SOR' 2012, P-27, 7.5.2) |
| 50 | Laying/Hanging of one no. PVC insulated power cable of 1.1 KV grade of 70 sq mm after making fresh lead (CPWD SOR' 2012, P-27, 7.5.2) |
| 51 | Making fresh new cable jumper with O/H line |
| 52 | Transportation of pole at site |
| 53 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 54 | Fabrication & erection of bracket & clamps |
| 55 | Supply and erection of M.S Nut & Bolts |
| 56 | Supplying and erection of 100 mm X 110 mm shackle insulators with G.I bolts, nuts, and straps etc. as required (CPWD SOR' 2012, P-39, 12.17) |
| 57 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 58 | F) FOR 13 No. LT O/H line maintenance - Dismantle of pole/street light standard/strut embedded in cement concrete foundation etc. as required (CPWD SOR' 2012, P-40, 12.42). |
| 59 | Transportation of pole at site |
| 60 | Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3) |
| 61 | Fabrication & erection of bracket & clamps |
| 62 | Supply & erection of M.S Nut & Bolts |
| 63 | Supplying and erection of 100 mm X 110 mm shackle insulators with G.I bolts, nuts, and straps etc. as required (CPWD SOR' 2012, P-39, 12.17) |
| 64 | Erection of Conductor of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) |
| 65 | Erection of Conductor of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) |
| 66 | Making new jumper with O/H line |
| 67 | G) FOR main sub station O/H maintenance work - Making of Earthpit by G.I earthing pipe with charcoal & salt |
| 68 | Connection Transformer/Switch neutral & body with earthpit by cable lead |
| 69 | H) FOR Store Work - Crane for Transportation of 12 mtrs 3 nos poles from Regional Store to Colliery store with 6 heads i.e 6000 + 4404 = Total Rs. 10404.00 |
| 70 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |