| 1 | Earth work excavaton in foundation in hard soil or gravelly soil within 50 m initial lead and 1.5m initial lift including rough dressing and bracking clods to maximum 5 cm to 7 cm and laying in layers to exceeding 0.3 m in depth and as per direction of the department. |
| 2 | Filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, cess, Tools and Plants etc.all complete required for the work to finished items.14 |
| 3 | Cement concrete (1:4:8) with 40 mm size hand broken hard granite metal including all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete,as per OPWD specification required for the work to finished items of work. |
| 4 | Cement concrete work of M15 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete, as per OPWD specification required for the work to finished items of work.39 |
| 5 | Cement concrete work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, cess, Tools and Plants water for curing etc. all complete,as per OPWD specification required for the work to finished items of work. 40 |
| 6 | Requirement of HYSD/ MS rod & labour for cutting, bending, binding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge, cess. |
| 7 | Rigid and smooth centering and shuttering for CC/ RCC works in foundation,plinth band and footings bases of columns mass concrete pre-cast slabs etc including false work and dismentalling then after casting including cost of materials, cess complete in ground floor.43,46 |
| 8 | Transporting the excavated earth by Mechanical means within 5.00 Km lead including initial lead and lift, loading & unloading etc all complete. Please Enable Macros to View BoQ information |