| 1 | Dismantling concrete |
| 2 | Cement concrete plain 1:4:8 or 1:5:10 |
| 3 | Cement concrete plain1:2:4 mix |
| 4 | Dismantling of Flexible Pavements (By Mechanical Means) |
| 5 | Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000mtr. |
| 6 | Dismanlting and Relaying of 60mm thick CC interloking paver bolcks of M-35 including concerte base and relaying of same over 50mm thick sand laid over 100 mm thick base coures CC 1:816 complete in all respects including sand grouting etc. |
| 7 | Excavation manually in trenches with straight or open cutting in a builtup street/Lanes having wall to wall width upto 3 meter for sewer and manholes to full depth as shown in drawings including shoring, dressing to correct sections and dewatering of rain water, provision for diversion for traffic, protection of existing services i.e. telephone cables, electric lines, water supply lines and gas lines etc. night signals, profiles, pegs, sight rails, boning roads, fixing and maintenance of caution boards, fencing, refilling trenches, watering, dressing and restoration of surface to original level and removal of surplus spoils from the site of works upto 15 mtr., for all works other than connections to complete in all respects. |
| 8 | For depth not exceeding 2 m. below Ground level |
| 9 | (i) All classes of soil except rocky |
| 10 | Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc. |
| 11 | R.C.C. Pipe NP -3 |
| 12 | 450mm i/d pipe |
| 13 | 300mm i/d pipe |
| 14 | Constructing brick masonry manhole in cement mortar 1:5 ( 1 cement : 5 coarse sand ) R.C.C. top slab 20cm thick using M-20 mix by using mixer and vibrator, TMT Fe500 @ 80.00 kg/per cum, foundation concrete 1:4:8 mix (1 cement: 4 coarse sand : 8 graded stone aggregate 40mm nominal size) |
| 15 | Inside size 90x150 cm and 120 cm deep |
| 16 | Extra payable for every 0.30 m additional depth of manhole chamber in item 29.55 upto 1.80 m increase in depth. |
| 17 | Inside size 90x150 cm and 120 cm deep |
| 18 | Plugging of Manhole with the help of sand filled bags including cost of sand and labour complete Job. |
| 19 | Pumping out water for execution of work. |
| 20 | Repair of house hold water supply connection including cost of material and labour complete JobTotal 6 Nos. |
| 21 | Repair of house hold Sewer connection including cost of material and labour complete JobTotal 6 Nos. |
| 22 | Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of bedsand sides of chambers to exact profiles, 15cm thick C.C 1:6:12 in foundation, first class brick work laid in cement sand mortar 1:5, 40mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12.50mm in thickness of 1:2 cement sand plaster and finished with a floating coat of neat cement 1mm thick left absolutely smooth polished and correct to template including cost of precasted RCC road gully grating and frame including paint with coal tar (as specified in item No. 29.74) complete and to the requirement of the |
| 23 | Double Road Gully Chamber |
| 24 | Size 1448mm x 457mm x 800mm |
| 25 | Making connection of newly laid sewer in walls of existing manhole of fully charge sewer including cost of pluging sewer, desilting, removal of sullage water and making good of khudda |
| 26 | Sewer connection above 300 mm i/d and upto 700 mm i/d |
| 27 | Dismantling and relaying Kerb Channels complete in all respects. |
| 28 | Cement concrete 1:4:8 |
| 29 | With stone aggregate 40mm gauge |
| 30 | mixing by manual means |
| 31 | Cement concrete 1:2:4 |
| 32 | mixing by manual means |
| 33 | Dry brick on edge paving sand grouted over 50mm thick earth and mud plaster |
| 34 | Carriage of Surplus soil (Lead upto 7 Km) Qty of dismantling+ Qty of sand filling |
| 35 | Carriage of Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders, Kankar and Building Rubbish, Earth. |
| 36 | 75 Km |
| 37 | Carriage of bricks ( Lead 25km ) Please Enable Macros to View BoQ information |