| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. |
| 2 | All kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 5 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for : |
| 8 | Foundations, footings, bases for columns. |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 12 | Suspended floors, roofs, landings, balconies and access platform |
| 13 | Edges of slabs and breaks in floors and walls Under 20 cm wide |
| 14 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 15 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 16 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 17 | Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 18 | 12 mm cement plaster of mix : |
| 19 | 1:4 (1 cement: 4 coarse sand) |
| 20 | Neat cement punning |
| 21 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 22 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 23 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. |
| 24 | In cement mortar |
| 25 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. |
| 26 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.Note:- Payment will be made as per weight slip issued by authorised MCD dumping ground after dumping of malba. Processing fees at prescribed rate of authorised MCD dumping ground will be submitted by the agency & shall be reimbursed by the department on production of receipt in original. |
| 27 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. |
| 28 | 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 29 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. |
| 30 | 40/50mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch type Hot Mix Plant of 100-120 TPH capacity. |
| 31 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 32 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 33 | With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 |
| 34 | Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50m x 2.00m made of 40x40x6 mm angle iron or 50x50x3 mm hollow MS tube posts/ horizontal members/ bracings covered with 1.63 mm thick MS sheet. The sheet shall be fixed with 30x5 mm MS flat by suitable welding / riveting. The panels shall be made so that gap of 50 cm above the ground is available making over all height as 2.50m. MS channel ISLC 75 @ 5.70 kg/m, 50 cm long shall be provided at the bottom having oval shaped holes of size 50x25 mm at both ends with 50 cm long MS angle 40x40x6 mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250 mm long expansion fasteners at both ends. |
| 35 | The work shall be executed as per drawing/ direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in- Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour, materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). |
| 36 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 37 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality EHD - 35 |
| 38 | Circular shape 560 mm internal dia. |
| 39 | Constructing brick masonry road gully chamber 50x45x60 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm pre-cast R.C.C. horizontal grating with frame complete as per standard design : |
| 40 | With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 |
| 41 | Modified Estimate Cost after correction on DSR items on a/c of [email protected] i.e. deduct for effect of correction factor on Item No. 1 to 22 (1-0.973)=0.027 on X (DSR Item) |
| 42 | Add Cost Index @ 3.00% on DSR Items |
| 43 | Providing and Laying of MS pipe i/c specials of any size on ground or upto 3 Meter depth below the ground made out of 10 mm Thick MS plate i/c welding, cutting, painting both side with black anticorrosive bitumastic paint of approved brand and tested to a head of Rate 15 kg/sqm conforming to IS 3589/1981, IS 7322-1974, IS 784-1978 and relevant codes i/c cost of plate and carriage at site complete as directed by Engineer-in-Charge. (actual weight will be paid) |
| 44 | Laying of Suitable dia. MS pipe & Specials made out of MS plate out of 10 mm Thick MS plate through trenchless Technology by Jack Pushing , directly in ground upto the depth of 3 meters below from the ground level i/c welding, cutting, painting both Approved side with black anticorrosive bitumastic paint of approved brand and tested to a head of Rate 15 kg/sqm conforming to IS 3589/1981, IS 7322-1974, IS 784-1978 and relevant codes i/c cost of plate and carriage at site complete as directed by Engineer-in-Charge.(payment of pipe & Specials will be made in respactive items , laying will be measured end to end finish lenght excluding length in Manhole/Chamber/Sump etc. ) |
| 45 | Carrying out subsurface survey at above mentioned across the road showing Water supply Pipelines, Sewer lines, Telecom Cables, Communication lines, drains, Gas Pipe Lines, Anchors, Oil Pipe Lines, Electric Cables, & other conduits etc. in the proposed corridor along with providing depth and dimensional details of Underground utilities and mapping as per sub surface utility Engineering-SUE ASCE 3802 & INDS TT :401-2018 (Indian Society for Trenchless Technology). |
| 46 | Dewatering of pits or ground by dewatering pump , inclusive of all consumables, diesel oil, petrol, and lubricants etc. and disposal of water in all type of soils. Please Enable Macros to View BoQ information |