| 1 | Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade of size 400 Sq.mm/3.5C direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 2 | Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade additional cables of size 400 Sq.mm/3.5C direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 3 | Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade of size 185 Sq.mm/3.5C direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 4 | Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade additional cables of size 185 Sq.mm/3.5C direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 5 | Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade of size 35 Sq.mm/3.5C and upto 95 Sq.mm/3.5C direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 6 | Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade additional cables of size 35 Sq.mm/3.5C and upto 95 Sq.mm/3.5C direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 7 | Laying of XLPE Insulated 1.1KV grade cables of size upto 35 Sq.mm direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 8 | Laying of one nember PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade additional cables of size upto 35 Sq.mm direct in ground including excavation, sand cushioning, protective covering and refilling the trench as per specifications, in Soft soil |
| 9 | Handling/ Laying of XLPE Insulated 1.1KV grade cables of size 400 Sq.mm/3.5C, which are not necessarily laid in ground but part of it going upto panels, transformer and part in the building in open trench or otherwise. |
| 10 | Handling/ Laying of XLPE Insulated 1.1KV grade cables of size 185 Sq.mm/3.5C, which are not necessarily laid in ground but part of it going upto panels, transformer and part in the building in open trench or otherwise. |
| 11 | Handling/ Laying of XLPE Insulated 1.1KV grade cables of size 35 Sq.mm/3.5C and upto 95 Sq.mm/3.5C, which are not necessarily laid in ground but part of it going upto panels, transformer and part in the building in open trench or otherwise. |
| 12 | Handling/ Laying of XLPE Insulated 1.1KV grade cables of size upto 35 Sq.mm, which are not necessarily laid in ground but part of it going upto panels, transformer and part in the building in open trench or otherwise. |
| 13 | Drawing of XLPE Insulated 1.1KV grade cables of size 400 Sq.mm/3.5C, in existing RCC/HDPE pipe, close duct, subway or substation. |
| 14 | Drawing of XLPE Insulated 1.1KV grade cables of size 185 Sq.mm/3.5C, in existing RCC/HDPE pipe, close duct, subway or substation. |
| 15 | Drawing of XLPE Insulated 1.1KV grade cables of size above 35 Sq.mm/3.5C and upto 95 Sq.mm/3.5C, in existing RCC/HDPE pipe, close duct, subway or substation. |
| 16 | Drawing of XLPE Insulated 1.1KV grade cables of size upto 35 Sq.mm, in existing RCC/HDPE pipe, close duct, subway or substation. |
| 17 | Supplying and laying HDPE pipe ISI marked, PE-80, PN-4 Class of size 125 mm Dia (Od) across road/service road by trenchless technology in various roads / service road /main gate in NDMC area. |
| 18 | Supplying and laying HDPE pipe ISI marked, PE-80, PN-4 Class of size 110 mm Dia (Od) across road/service road by trenchless technology in various roads / service road /main gate in NDMC area. |
| 19 | Road cut of any thickness (metaled/concrete) for one LT cableRoad Berm/Stone/Brick footpath/C.C Slab/Approach gate. |
| 20 | Road cut of any thickness (metaled/concrete) for additional LTcable Road Berm/Stone/Brick footpath/C.C Slab/Approach gate |
| 21 | ADD: GST @ 18% Please Enable Macros to View BoQ information |