| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 & 300.2 with lead upto 1000 m as per Technical Specification Clause 303.5. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 2 | Supply & laying of N.P.-3 Hume Pipe 1000 mm Dia (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with motor grader on prepaid surface mixing by mix in place method with front & loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 4 | Brick soling with straight overburnt bricks laid on edge complete including preparation of subgrade to required camber and including supply of bricks, filling joints with local earth spreading a blind coat of 1cm(3/8\\") depth of local earth P.I. 5 to 7 or sand over the entire surface and including labours, T&P etc. required for proper completion of work. Ch-20, S.I. 762 (b) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 5 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. As per Morth Specification. Sr 2.04 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 6 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 7 | Dismantling of Granular courses and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 8 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 10 | Dewatering work of undergrounding water as well as surface water with the help of diesel engine pumping set during earth work in excavation of foundation for laying lean concrete and brick work in foudation (or as required), hire charging of pumping set, Fuel charge, labour and other T&P including cost of operation as per requirement at site & as direction by Engineer-in-Charge (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 11 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per Morth Specification No.-15.01, 304(B) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 12 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 13 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORTH Specification No. 304, S.I. 12.3 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 14 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. As per MORTH Specification No. 1500, 1700 & 2100 S.I. 15.11 (P.C.C. Grade M-15) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 15 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.. As per Morth Specification No. 1500, 1700 & 2100 21.08 (R.C.C. Grade M-30) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 16 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete asper Drawing and Technical Specifications. As per Morth Specification 15.00 S.I. 1600 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 17 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications As per Morth Specification 1500, 1700 & 2200, (RCC Grade M-30) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 18 | Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and Technical Specifications. As per Morth Specification 1600& 2200 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 19 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification 1500 &1600 1700 Sr 14.01 (RCC Grade M-30) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 20 | Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications As per Morth Specification 1600 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 21 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification As per MORTH Specification No. 2700 sr 15.15 (P.C.C. Grade M-15) ( BELOW APROACH) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 22 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. (12mm dia bar at 150mm C/C in both Direction) As per Morth Speciation No. 1500, 1600, 1700 & 2704 S.I. 15.16 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 23 | Providing & fixing of drainage Spouts P.V.C. Pipe 110mm dia complete as per drawing and Technical specification. Clause 2705 Sr. 15.17 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 24 | Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical Specifications (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 25 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (8mm Dia Bar at 150mm C/C in both Direction) As per MORTH Specification 2702, S.I. 15.18 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 26 | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete As Per Morth Specification 15.22 Clause 2605 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 27 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. As per Morth Specifiatiion Sr 15.21, Clause 800 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 28 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification As per Morth Specification 710.1.4.of IRC:78 & 2200 S.I. 15.23 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 29 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 30 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.1 & 300.2 with lead upto 1000 m as per Technical Specification Clause 303.5. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 31 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 32 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 33 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 34 | Providing and applying prime coat with Bitumen emulsion on prepared surface of granular base including cleaning of road surface etc and spraying primer at the rate of 0.70/Sqm. using mechnical means as per Technical Specification. Clause 502, S.L.-5.10, of MORD specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 35 | Providing and applying Tack coat with Bitumen VG-10 using distributor at the rate of 0.35Kg. per Sqm. on the prepared primed surface cleaned with Hydraulic broom as per Technical Specification. Clause 503, S.L.-5.20, of MORD specification. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 36 | Providing,laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm. to 5.60 mm. aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN. static roller capacity, finished to required level and grades to be followed by seal coat of either Type-C as per Technical Specification. Clause 508, S.L.-5.9, of MORD specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) |
| 37 | Providing,laying seal coat sealing the voids in a bitumenious surface laid to the specified levels, grade and cross fall using Type 'C' as per Technical Specification. Clause 510, S.L.-5.12, of MORD specification (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) Please Enable Macros to View BoQ information |