| 1 | Uprooting narkul & moonj including proper disposal beyond 100 mts. with all cost of labour and T&P etc.required for proper completion of work. |
| 2 | Earth work in filling including all leads & lifts excluding mechanical compaction but including manual compaction and dressing to profile with all cost of labour and T&P etc.required for proper completion of work. |
| 3 | Dry Earth work in foundation of masonry work on channels discharge below 10 cumecs including all lead & lift, cost of labour and T&P etc.required for proper completion of work. |
| 4 | Providing and laying PCC of concrete grade (M-10) 1:3:6 with coarse sand with F.M. more than 2 and stone grit size of 20-40mm including cost of all materials, labour, T&P etc.required for proper completion of work. |
| 5 | Centering and shuttering including cost of shuttering, propping etc. and removal of form work for foundations, footings, bases for columns required for proper completion of work. |
| 6 | Prepration of the Subgrade before construction of lining including cost of all labour,T&P etc. required for proper completion of work. |
| 7 | Brick masonry in 1:4 Cement and sand mortar using class 150 bricks complete in all respect including all cost of material, labour and T&P etc.required for proper completion of work. |
| 8 | Providing and laying double flat brick lining with 1:3 Cement and sand mortar using class 150 bricks complete in all respect including cost of all materials, labour and T&P etc. required for proper completion of work |
| 9 | Laying 200 micron LDPE film on the Subgrade before construction of lining including cost of all material, labour,T&P etc. required for proper completion of work. |
| 10 | S/F of Local sand with all lead & lift, dressing including all cost of labour and T&P etc. complete in all respects required for proper completion of work. |
| 11 | Cleaning of Site for repair works of structures (Jungle, Jhadi and Kabad etc.) including cost of labour and T&P etc. required for proper completion of work |
| 12 | Dry Earth work in foundation of masonry work on channels of discharge below 10 cumecs including all lead & lift, cost of labour and T&P etc. required for proper completion of work. |
| 13 | Earth work in filling including all leads & lifts excluding mechanical compaction but including manual compaction and dressing to profile with all cost of labour and T&P etc. required for proper completion of work. |
| 14 | Providing and laying PCC of concrete grade (M-10) 1:3:6 with coarse sand of F.M. more than 2 and stone grit of size 20-40mm including cost of all materials, labour, T&P etc. required for proper completion of work. |
| 15 | Providing and laying PCC of concrete grade (M-15) 1:2:4 with coarse sand of F.M. more than 2 and stone grit of size 4.75-20mm including cost of all materials, labour, T&P etc.required for proper completion of work. |
| 16 | Centering and shuttering including cost of shuttering, propping etc. and removal of form work for foundations, footings, bases for columns required for proper completion of work. |
| 17 | Brick masonry in 1:4 Cement and sand mortar using class 150 bricks complete in all respect including all cost of material, labour and T&P etc. required for proper completion of work. |
| 18 | Struck Cement Pointing with cement sand mortar 1:2 complete in all respect including all lead, lifts, cost of material, labour and T&P etc.required for proper completion of work. |
| 19 | Finishing wall with such as super snowcem, Durocem, robiecem, Guttucem, supercem quality of required shade on new wall surface (two coats) over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered materials including curing with all cost of material, labour and T&P etc.required for proper completion of work. |
| 20 | Unlaying, Laying and fixing in position and alignment of NP-3 pipe excluding excavation, back filling, and cost of materials but including labours T&P etc. required for proper completion of work. |
| 21 | Writing letter on U/S of VRB/DRB above 50mm size including all cost of material, labour and T&P etc.required for proper completion of work. |
| 22 | P/F wheel gaurd including all cost of labour and T&P etc. complete in all respect required for proper completion of work. |
| 23 | Supplying & Fixing of kilometer Stone including all cost of Material, labour and T&P etc. required for proper completion of the work |
| 24 | Supplying & Fixing of Hectometer/ boundary Stone including all cost of Material, labour and T&P etc. required for proper completion of the work. |
| 25 | B.O.E. Soling with sand binding after surface preparation and its ramming complete in all respect including all cost of labour and T&P etc.required for proper completion of work. Please Enable Macros to View BoQ information |