| 1 | Jungle clearance with cutting of Narkul & Moonj including all cost of labour, T&P and proper disposal beyond 100.00 Meter etc. complete in all respects required for porper completion of the work. |
| 2 | Dry Earth work in foundation of masonry work on channels discharge below 10 cumecs including all lead & lift, cost of labour and T&P etc. required for porper completion of the work. |
| 3 | Centering and shuttering for P.C.C./R.C.C. work including cost of all materials, labour, tools & plants etc. required for proper completion of work. |
| 4 | Brick work in 1:4 Cement and sand mortar using class 150 bricks with coase sand F.M. more than 2 including cost of all material labour,T&P etc required for porper completion of the work. |
| 5 | Providing and laying PCC of concrete grade (M-10) 1:3:6 with coase sand F.M. more than 2 and stone ballast size 20-40 mm including supply of all materials, labour, tools and plants etc. required for proper completion of work. |
| 6 | Providing and laying PCC of concrete grade (M-15) 1:2:4 with coase sand F.M. more than 2 and stone ballast size 4.75mm to 20 mm including supply of all materials, labour, tools and plants etc. required for proper completion of work. |
| 7 | Cement Pointing with 1:2 cement sand mortar (Ruled/Struck) complete in all respect including all lead, lifts, cost of material, labour and T&P etc.required for porper completion of the work. |
| 8 | Painting on both sides of each parapet, Wing wall & Boundary Pillar with finishing premium acrylic smooth exterior paint with silicon additives of required shade of two or more coat applied @1.43 lt/10 sqm over and including priming coat of exterior primer applied 2.2kg/10 sqm .(apex ultima , berger or equivalent as approved by engineer -in-charge. required for porper completion of the work. |
| 9 | Writing Letter above 80 mm Size on the V.R.B./D.R.B./P.R.B. & Boundary Pillar as per direction of Engineer-in-Charge including all cost of Material, Labour and T&P etc. complete in all respects required for porper completion of the work. |
| 10 | Relaying and Fixing RCC NP-3 Pipe as per direction of Engineer-in-Charge excluding soil excavation and back filling but including all cost of Labour and T&P etc but excluding soil excavation and back filling complete in all respects required for porper completion of the work. |
| 11 | Providing and fixing wheel guard as per direction of Engineer-in-Charge including all cost of Material, Labour and T&P etc. complete in all respects required for porper completion of the work. |
| 12 | Dry brick on edge pitching with class 150 bicks including preparation of sub grade and filling joints with local sand including cost of sand as per direction of Engineer-in-Charge including all cost of Material, Labour and T&P etc. complete in all respects required for porper completion of the work. |
| 13 | Prepration of the Subgrade before construction of lining including cost of all labour,T&P etc required for proper completion of work. |
| 14 | Laying the 200 micron LDPE film on the Subgrade before construction of lining including cost of all material, labour,T&P etc required for proper completion of work. |
| 15 | Laying 100 mm thick Local Sand filter above the 200micron LDPE film including cost of all material labour,T&P etc required for proper completion of work. |
| 16 | Supply and Fixing Precast C.C. Boundry piller of concrete grade (M-15) 1:2:4 (1 cement :2 Coarse sand: 4 stone grit 4.75-20 mm gauge nominal size) including centering, shuttering, cost of all material labour,T&P etc complete in all respects required for proper completion of work. Please Enable Macros to View BoQ information |