Name of Work:- REPAIRING, CONSTRUCTION AND MAINTENANCE CULVERTS ON VARIOUS ROADS DURING RAINY SEASON UNDER SUB DIVISION NO.3 REWA
Sl. No.
Item Description
1
Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood, steel, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 metresCement Concrete Grade M-15 & M-20
2
Dismantling of Cement Concrete PavementDismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling Serviceable material at designated locations and disposal of unserviceable materials up to a lead of 1000 metres
3
Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom as per relevant clauses of section 300 & 2100 in(i) Depth upto 3 m
4
PCC M-15 in FoundationPlain cement concrete M-15 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORT&H Specification 409.
5
Providing P.C.C. M-15 Nominal mix for hume pipe culverts in foundation and sub structure etc. as per drawing and as per relevant clauses of section 1500, 1700, 2100 and 2900. Cum 4617.00 62
6
Providing and Laying Reinforced Cement Concrete Pipe NP 4 /prestrssed concrete pipe on first class bedding in double row. Providing and Laying Reinforced cement concrete pipe NP4 /prestrssed concrete pipe for culverts on first class bedding of granular material (cost of bedding included) in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapetsA 1000 mm dia
7
Providing and Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row. Providing and Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material (cost of bedding included) in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.A 1000 mm dia Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.