| 1 | DL1 - SEWAGE SYSTEM |
| 2 | CARRY OUT CHEMICAL CLEANING OF SOIL LINE VIEW CLOGGED. JOB INVOLVE OPENING, CLEANING, RE-FITMENT AND PROVING OF VACUUM IN SOIL LINE. QTY - 150 RMT, DIA - 50MM |
| 3 | REMOVE & REFIT OF DRAIN LINE AFTER CHEMICAL CLEANING TO CLEAR CLOGGED PARTICLES AND PRESSURE TESTING. DIA- 50MM. |
| 4 | HOLES OBSERVED IN VENT PIPE OF HOLDING TANK. RA FOR RENEWAL OF VENT LINE, QTY- 05 RMT DIA- 25MM, MAT - CU-NI |
| 5 | REMOVE & REFIT OF ALL SYSTEM/SEWAGE PIPELINE AFTER CHEMICAL CLEARING TO CLEAR CLOGGED PARTICLES AND PRESSURE TESTING. DIA - 50MM, MAT: GI |
| 6 | RENEWAL OF SEWAGE PIPE LINE IF PT FAILS. DIA - 50MM, MAT: GI |
| 7 | DL2- LP AIR SYSTEM |
| 8 | REMOVE & REFIT AFTER PRESSURE TESTING OF LP AIR SYSTEM PIPE LINE. MAT: GI15MM - 30 MTRS, 20MM - 70 MTRS |
| 9 | RENEW LP AIR SYSTEM PIPELINE IF PT FAILS. MAT: GI 15MM - 25 MTRS, 20MM - 25 MTRS |
| 10 | DL3- EDA (TA 2/4 AB 180 KIRLOSKAR) |
| 11 | REMOVE & REFIT OF EMERGENCY DA EXHAUST PIPE LINE AFTER CLEARING CARBON PARTICLE ACCUMULATED AND PRESSURE TESTING. MAT- MS |
| 12 | DL4-MARINE AC SEA WATER SYSTEM |
| 13 | OVERHAUL SEA WATER LINES OF MARINE AC. SOW INCLUDES DISMANTLING FROM POSITION, GAUGING, PRESSURE TESTING AND FITMENT BACK TO LOCATION. RENEW AS REQUIRED. |
| 14 | REMOVE & REFIT OF AC DRAIN PIPE LINE AFTER CHEMICAL CLEANING TO CLEAR CLOGGED PARTICLES AND PRESSURE TESTING. MAT- CUNI. DIA 32MM |
| 15 | RENEWAL OF DRAIN PIPE LINE OF MARINE AC AND CONNECT TO OLD DRAIN LINE. MAT-CUNI, DIA- 32 MM |
| 16 | RENEWAL OF MARINE AC SEA WATER PIPE LINE. MAT- CUNI, DIA-32 MM |
| 17 | REMOVE & REFIT OF MARINE AC SEA WATER PIPELINES AFTER PRESSURE TESTING. MAT- CUNI, DIA-32 MM |
| 18 | RENEWAL OF MARINE AC SEA WATER PIPELINES IF PT FAILS. MAT- CUNI, DIA-32 MM |
| 19 | MANUFACTURING OF DECK PENETRATION FOR SEA WATER PIPE LINE. VIEW PERISHED AND DETERIORATED AT FOLLOWING LOCATIONS TO BE UNDERTAKEN: -(A) SHIP'S OFFICE-04(B) CHART HOUSE-04(C) COCKPIT STORE-02(D) ENGINEERING STORE-02(E) CADET MESS-02JOB INVOLVE REMOVAL OF WOODEN FLOORING AT VARIOUS LOCATION AND CUTTING AND WELDING TO BE CARRIED OUT AS PER SAMPLE. QTY-14PIPE SIZE: 32 MM , MAT:CUNI |
| 20 | RENEWAL OF CAPTAIN AC SEA WATER PIPE LINE. MAT- CUNI, DIA- 32MM |
| 21 | DL5 - SPRINKLING SYSTEM |
| 22 | RENEWAL OF SPRINKLING SYSTEM PIPE LINE. MAT- CUNI, DIA-32MM |
| 23 | REPLACEMENT OF YARD SUPPLIED QUARTZ BULB NOZZLE |
| 24 | DL6 - BILGE WATER SYSTEM |
| 25 | REMOVE & REFIT OF SEA WATER LINE AFTER PRESSURE TESTING. MAT- CUNI ,DIA-50 MM |
| 26 | RENEWAL OF SEA WATER LINE IF PT FAILS , MAT- CUNI ,DIA-50 MM |
| 27 | RENEWAL OF BILGE WATER PIPE LINE. MAT- CUNI, ,DIA-50 MM |
| 28 | DL7 - FIREMAIN SYSTEM |
| 29 | RENEWAL OF FIREMAIN SYSTEM SEA WATER PIPE LINE. MAT- CUNI, DIA-65 MM |
| 30 | REMOVE & REFIT OF SEA WATER PIPE LINES AFTER PRESSURE TESTING. MAT- CUNI, DIA-65 MM |
| 31 | RENEWAL OF SEA WATER PIPELINE IF PT FAILS. MAT- CUNI, DIA-65 MM |
| 32 | DL8 - CO2 MAJOR FIRE FIGHTING SYSTEM |
| 33 | RENEWAL OF CO2 MAJOR FIRE FIGHTING SYSTEM PIPELINES WITH ADAPTER/ UNION AND SYSTEM PRESSURE TESTING UP TO 100 BAR. MAT-SS Please Enable Macros to View BoQ information |