| 1 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level. All types of soil 300 mm dia (DSR 23.1.1.1) |
| 2 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre depth below ground level. All types of soil 300 mm dia (DSR 23.2.1.1) |
| 3 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge.150mm dia.(DSR 23.3.2) |
| 4 | Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer-in-charge. 150 mm Dia. (DSR 23.4.2) |
| 5 | Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge. (DSR 23.8) |
| 6 | Development of tube well in accordance with IS : 2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by \\"V\\" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. (DSR 23.12) |
| 7 | Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell of: 150 mm dia(DSR 23.13.2) |
| 8 | Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete. 150 mm clamp(DSR 23.14.2) |
| 9 | Providing and fixing Bail plug/ Bottom plug of required dia to the bottom of pipe assembly of tubewell as per IS:2800 (part I).150 mm dia.(DSR 23.15.2) |
| 10 | Supply and fixing of MS top plug of heavy quality including all labour material & T&P.150 mm dia. (NSI No. 19.18e) |
| 11 | Transportation and installation of tube well drilling Rig m/c, compressure for development and other required equipments and accessories at site of work and dismentlling & taking them back after successful completion of the work including cleaning, levelling - dressing the site properly, also disposing off the surplus earth, silt, sand etc. (NSI No. 19.28) |
| 12 | Supply and installation of electrical contral panel of L & T / Havels or equivalent make for single phase submersible pumpset containing contractor relay,ampermeter,voltmeter,preventor etc for 5.0 H.P.pumpset.(NSI No.19.31d) |
| 13 | Supply & Installation of single phase submersible pump of three phase 5 HP outlet 50mm dia. or more, Head 60/24, Discharge 9000/24000 LPH of K.S.B. or eqt. make including cost of labour, T&P and material required for completion of work, with one year of warranty of site.(NSI No. 19.32e) |
| 14 | Lowering of M.S. column pipe in tubewell including supply of nuts, and bolts, packing and also carriage of pipe from workshop to site including all labour, T&P etc. required for proper completion of the work. (NSI No. 19.27) |
| 15 | Supplying and drawing following 3 x 4 sq. mm sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface/ recessed steel/ PVC conduit as required.(DSR E&M 2022 1.17.12) (DSR 27.23) |
| 16 | Supply & fixing of steel wire rope for submersible pump including cost of labour, T&P and material required for completion of work. (NSI No. 19.34) |
| 17 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc 20 mm nominal dia Pipes(DSR 18.12.2) |
| 18 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc 25 mm nominal dia Pipes(DSR 18.12.3) |
| 19 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc 40 mm nominal dia Pipes(DSR 18.12.5) |
| 20 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 20 mm nominal bore (DSR 18.17.1A) |
| 21 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 25 mm nominal bore (DSR 18.17.1) |
| 22 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 40 mm nominal bore (DSR 18.17.3) |
| 23 | Providing and fixing gun metal non- return valve of approved quality (screwed end) 40 mm nominal bore horizentel (D.S.R 18.19.3.1) |
| 24 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.(DSR 2.6.1) |
| 25 | Providing and laying 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(DSR 4.1.10) |
| 26 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR No. 6.1.1) |
| 27 | 12 mm cement plaster1:4 (1 cement: 4 coarse sand) of mix :(DSR 13.4.1) |
| 28 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more (DSR 5.22.6) |
| 29 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(DSR 5.3) |
| 30 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge 18.9.6 50 mm nominal dia Pipes |
| 31 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank (DSR-18.48) |
| 32 | Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 16.7.1 |
| 33 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately).16.75 |
| 34 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.16.42 Please Enable Macros to View BoQ information Special Condition :- |
| 35 | Tenderers are required to quote their offer as “above / at par / below” in the estimated cost. |
| 36 | The rates are to be filled up in figures and words both. |
| 37 | Departmental rates are exclusive of GST.GST will be borne by department as per applicable rules. Labour Cess, Royalty and all other Taxes are liable to be paid by Firm/Contractor. |
| 38 | In case of any discrepancy between the language of the items of bill of quantity and that of PWD the later shall prevail. |
| 39 | Tenders are advised to visit the site of work and make themselves acquainted with the site conditions. No claim whatsoever shall be entertained after submission of tender. |
| 40 | Quantities are approximate and may vary up to any extent on either side as per requirement of the site conditions in the direction of Engineer-In-charge or may not be executed at all for which no extra claim shall be entertained. |
| 41 | All above works shall be executed as per U.P.P.W.D/ U.P.P.T.C.L. specification or as directed by Engineer-In-charge. |
| 42 | The work may be carried in energized s/s area having high voltage installation contractor must employee trained supervisor & labour to work in such electrical/ hazardous area. All risk to men & materials shall be contractor's resposibilitiy |
| 43 | All risk to men, labour & materials shall be contractor’s responsibility. |
| 44 | All materials shall be arranged by the contractor’s at his own cost. |
| 45 | No handling charges of T&P and labour will be paid for extended period of contract, if any. |
| 46 | Rates quoted by Tenderer will remain firm till completion of scope of work of contract. |
| 47 | Contractor shall register his labour engaged in construction work in the office of Dy. Labour Commissioner ¼Hkou ,oa vU; lfUuekZ.k deZdkj ¼fu;kstu rFkk lsok ‘krZ fofu;eu½ v/khfu;e 1996. |
| 48 | Testing of material if any, required expenditure shall be borne by the contractor. Nothing shall be paid extra by the department. |
| 49 | Contractor has to made available 12 No cube at site and will frequently fill the cube at site. Accordingly cube test report will be submitted by contractor at his own cost. Final bill of work will be paid to contractor only after he will submit all satisfactory test result from authorized lab. |
| 50 | The contractor should have all related T&P like as concrete mixture, Needle & Surface vibratory, Slump test equipment & survey equipment etc. |
| 51 | Contractor has to put up all relevant drawing to SE (Civil) Prayagraj for approval at his own cost; nothing shall be paid extra for it. |
| 52 | As per G.O No. 622/23-12-2012-2. Audit/08 TC dt. 08 June 2012, Contractor has to deposit extra Security/ Performance guarantee, if the tendered rates are found below to the department rates. |
| 53 | As per section 171 of CGST Act, 2017 Any reduction in rate of tax on any supply of goods or service or the benefit of input tax credit shall be passed on the recipient by way of commensurate reduction in prices. Hence supplier/manufacturer to ensure to pass the benefit of reduced prices to UPPTCL, Further price quoted by supplier/Manufacturer is subject to scrutiny under above section” |
| 54 | Security of work will be released after six month from the date of completion of the work if no defect has been found after six month. |
| 55 | Only in case of non availability of departmental water supply, the contractor will make his own arrangements. However, in case of departmental water supply 1.5% deduction will be made from contractor's bill for water charges for the items which involve water consumption. |
| 56 | The bill Processing / Payment will be done according to existing UPPTCL Rule of ERP Portal. |
| 57 | If Tender has been cancelled after inviting due to any reason between tender call to final process, the tender cost will not refund to contractor, only EMD Will be refunded to Firm. |
| 58 | The 60% amount of brick available from dismantaling shall be recovered @ Rs. 3744.00/thousand + GST to Firm/Contractor. |
| 59 | The 30% amount of brick available from dismantaling shall be recovered as brick bats @ Rs. 1680.00/Cum + GST to Firm/Contractor. |
| 60 | The amount of Steel available from dismantaling will be recovered @ Rs. 20.00/KG + GST to Firm/Contractor. |
| 61 | Replaced CP Bib cock/piller cock/brass bib cock shall be recovered @ Rs. 25.00/each + GST to Firm/Contractor. |
| 62 | Old door and windows, shutter with chaukhat shall be recovered @ Rs. 70.00/Sqm. + GST to Firm/Contractor. SIGNATURE OF TENDERER / AUTHORISED PERSON ALONGWITH SEAL OF THE FIRM Name ……………………………..………..... Full Postal Address:………………………. ………………………………………………….. Phone No……………….. Mob. No………… |