| 1 | Earth work in Excavation in trenches by mechanical means for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. |
| 2 | Extra lead -1 and lift 3 |
| 3 | Compaction of soil machanical means including all work |
| 4 | Boaring with hydraulic power pilling side in M-25cc for 30 cm dia etc all work |
| 5 | RCC Work with cement concrete 1:2:4,1cement :2 coarse sand:4 stone Agregateexcluding centring shutring reinforcment etc all completion |
| 6 | Mild steel or Iron in Reinforcement including all completion of work. |
| 7 | Providing and Laying Cement concrete (1:4:8, 1cement: 4 fine sand: 8 Brick ballast nominal size 40 mm ) and curing complete, including cost of formwork in foundation and floors. |
| 8 | E/W exavation by labour in foul position etc all work |
| 9 | Class - 150 Brick Work in (1:4 ) cement mortar in Foundation&plinth including supply of all Materials Labour and Tool & Plants etc,required for proper completion of the work. |
| 10 | 12 mm thick cement plaster 1;4in single coat on Both side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not exceeding 80 mm in girth and finished even and smooth. |
| 11 | 40 mm thick red stone over12 mm thick cement motar in 1:3 etc all work |
| 12 | Rundom rubble masonary with hand stone in foundation and plint in 1:6 cement motar with cement and c- sand including leveling up with cement cinc in 1:6:12 with cement c-sand and 20 mm stone grip upto plinth level etc |
| 13 | Dry stone pitching 22.5 cm thick laid in coarse aggregars 75 mm thick 40 mm size and required profilel with hammer dressed stone having no side loss then 15 cm with minnimum depth 20 cm including all work |
| 14 | S/L of 600mm dia RCC hume pipe of NP-3 class with collar joint with stiff mix of cement motar including all labour work |
| 15 | S/F of hand railling 50mm and 1.5 mm thick and 3 nos. horizontal steel pipe of 19 mm dia and 1.5 mm of equal spacing with blustrade of ss pipe of 38 mm and 1.5 mm thick @ 1200 mm c/c etc all work |
| 16 | P/F of MS iron built up tubular hollow pipe etc |
| 17 | Survey work with total station method |
| 18 | Supply and fixing of display board etc all work |
| 19 | Supply and Laying GSB including all completion of work. |
| 20 | S/F OF kota stone etc all work |
| 21 | P/A wall putty of 1mm thick including all work |
| 22 | Finishing walls with two coat of acrylic smooth exterior paint of best quality Including supply of all material, labour and T&P etc. required for proper completion of the work. |
| 23 | Construction of manehole size .60x.60x1.20 m including brick work in 1:4 CI seat rcc manehole cover etc all work |
| 24 | Providing desiel dewtering pump etc all work |
| 25 | For light including all fitting |
| 26 | providing and Intalation of 1.5 hp submerible pump including all completion of work. |
| 27 | Providing and Installation of Floating Aerator 2.00 Hp 12 Amp 50Hz for 110-125 sqft and 3.00-4.00 mtr. Depth for water circulation and maintain DO at bottom of pond as directed by Engineer-in-charge. |
| 28 | Disposal of Earth up to 3 km including all completion of work. |
| 29 | Add 18% G.S.T Please Enable Macros to View BoQ information |