| 1 | SH:-Cement Concrete pavement - 223.20 Mtrs. |
| 2 | Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. |
| 3 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. |
| 4 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) [ for grading- I Material] |
| 5 | Dry Lean Cement Concrete Sub- baseConstruction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. |
| 6 | Cement Concrete Pavement:-Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 7 | Cable Duct Across the Road:-Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Triple Row for three utility services |
| 8 | Centring and shuttering including strutting proping etc. and removal of form work for:a) Foundations and plinth. |
| 9 | Carriage of Materials |
| 10 | SH: - RCC Retaining Wall (3Mtr. Ht.) - 80.00 Mtrs. |
| 11 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)I Ordinary soilA Manual Means(i) upto 3 m depth |
| 12 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 13 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specificationsa) RCC Grade M20 |
| 14 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsa) RCC Grade M20, Height upto 5m- Case I Using concrete Mixer |
| 15 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 16 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 17 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specificationa) Granular material |
| 18 | Add for Carriage of materials |
| 19 | SH- CC Drain - 180.00 Mtrs. |
| 20 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. |
| 21 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 22 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth |
| 23 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level. |
| 24 | Centring and shuttering including strutting proping etc. and removal of form work for:b) Walls including attached buttresses, pilasters etc. |
| 25 | 12 mm cement plaster 1 : 4 (1 cement : 4 fine sand) on the rough side of single or half brick wall. |
| 26 | Neat cement punning. |
| 27 | Add for carriage Please Enable Macros to View BoQ information |