Name of Work:- PROVN OF TOILETS FOR CANDIDATES AT GT GROUND, 3 AFSB UNDER GE (AF) CHILODA
Sl. No.
Item Description
1
BOQ 82302/CHL/E8 BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: CWE (AF) CHILODA Name of Work: PROVN OF TOILETS FOR CANDIDATES AT GT GROUND, 3 AFSB UNDER GE (AF) CHILODA CA No : CWE (AF) CHILODA /CHL / OF 2025-26 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Ser.No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT TOTAL AMOUNT In Words Represent (%) Percentage having Above/ Below ( + or - denomination) the Lump sum pre price inserted by MES
2
NOTE: Schedule ‘A’ Part I to VIII under Ser No. 1 to 9 here in after are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only.
3
Lump sum price worked out for BUILDINGS/ STRUCTURES as listed in Sch 'A’ Part I.
4
Lump sum price worked out for EXCAVATION & EARTH WORK as listed in Sch 'A’ Part II.
5
Lump sum price worked out for INTERNAL WATER SUPPLY as listed in Sch 'A’ Part III.
6
Lump sum price worked out for INTERNAL ELECTRIFICATION as listed in Sch 'A’ Part IV.
7
Lump sum price worked out for SEWAGE DISPOSAL as listed in Sch 'A’ Part V.
8
Lump sum price worked out for ROAD/ PATH/ HARDSTANDING as listed in Sch 'A’ Part VI.
9
Lump sum price worked out for EXTERNAL WATER SUPPLY as listed in Sch 'A’ PartVII.
10
Lump sum price worked out for EXTERNAL ELECTRIFICATION as listed in Sch 'A’ Part VIII
11
SCHEDULE `A' PART-IX (MISCELLANEOUS ITEMS OF WORK)(Note for following item- The contractor shall quote his rate for this item separately. The estimated rate is left blank since the same is not prepriced by MES)
12
EXTERNAL ELECTRIFICATION
13
Supply and fixing for MCCB 3 Pole, 415 volts fixed type, 40 Amps with breking capacity 16 KA with including IP 65 sheet metal enclosure complete all as specified and directed. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.