| 1 | Construction of Interlocking road & drain from H/o Mehsoob to Amik At Moh- Shekhan in ward no-14 At Nagar Panchayat Sahaspur, (Distt-Bijnor) |
| 2 | Dismantling of old Existing Interlocking Road i/C including stacking of material as directed by the Engineer-in-charge with-in-charge with in distance of 60 meeter (200 fee) |
| 3 | Disposal of dismentling road material with cartage upto loading and unloading including supply of all material,labour and T&P etc.required for proper completion of work. As per S.I. No. 231(a). |
| 4 | Dismentling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge with-in-charge with in distance of 60 meeter (200 fee). |
| 5 | Deduction of old and workable brick of 40% of dismantling brick work including supply of all material,labour and T&P etc.required for proper completion of work. |
| 6 | Deduction of bricks bats of 60% of dismantling brick work including supply of all material,labour and T&P etc.required for proper completion of work. |
| 7 | Cement concrete in 1:4:8 with cement,coarse sand and brick ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work |
| 8 | M-150 brick work in One part cement and Three part Course sand mortar in foundation and plinth including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 307. |
| 9 | 12 mm thick plaster with cement and approved course sand in proportion 1:3 over brick work minimum thickness not to be less than 1 cm including supply of all materials labour and T&P etc. required for proper completion of the work |
| 10 | Cement concrete in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work |
| 11 | WBM Grading 3 (22.4-53 mm Stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam in two layers specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 12 | Supply & fitting 80 mm thick Precast cement concerete I-Shape colour interlocking paver block a with top layer of minimum 8 mm thickness having plan dimension 200x(160+120mm) of O.P. cement, smooth high gloss finish, skid reditant. Manufactured from rubber moulds through vibro-compression machanism. the compressive strength of concrere paver block shall not be less than 30MPA (M-30) and weight 5kg per no confirming to IS:15658-2006 with a 4 cm thick layer of fine sand including cost of material, labour, T&P taxes etc required for proper completion of the work as directed by engineer-in-charge. as per Additional item road furnishing work no. 5(2). Grey Interlocking |
| 13 | Color Interlocking |
| 14 | Mild steel or iron work such as Channel including supply of all material,labour and T&P etc required for proper completion of work |
| 15 | Deduction of old and workable Interlocking tiles of 10% of dismantling brick work including supply of all material,labour and T&P etc.required for proper completion of work. |
| 16 | Supply & Fixing of Foundation / Inauguration board granite stone including supply of all material,labour and T&P etc required for proper completion of work |
| 17 | GST @ 18% |
| 18 | Round Off Please Enable Macros to View BoQ information |