| 1 | Earthwork in excavation in dense or hard soil/murrum, soft rock with earth pocket and boulders, Hard rock including removal of obstructions such as small trees, vegetation etc. and removal of excavated material up to a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete. |
| 2 | Soling with hard laterite rubble stone of 20 cm to 30 cm size including hand packing etc. complete. All labour & material ,tools & plant etc. complete |
| 3 | Cement concrete (1:2:4) using 20 mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. all labour and material etc. complete. |
| 4 | Constructing masonry in foundation and plinth using precast cement concrete solid blocks having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing etc. All labour & material etc. complete. |
| 5 | Constructing masonry in superstructure by using precast cement concrete solid blocks having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing etc. All labour & material etc. complete. |
| 6 | Constructing masonry in superstructure such as partition walls, parapets etc. 10 cm thick using precast cement concrete solid blocks having a crushing strength of not less than 35Kg./cm2 (28 days) and a mix not leaner than (1:5:10) in cement mortar (1:4) including providing specially moulded block at junctions and corners, providing 2 M.S. bars 6mm dia at every fourth course, all scaffolding, lifts, raking out joints, curing etc. All labour & material etc. complete. |
| 7 | Plastering with C.M. (1:5) 15mm thick in two coats for external surfaces (Backing coat of 10mm & finishing coat of 5mm) including Patches, bays, bands, fluting, scaffolding and fixing of chicken mesh wereever instructed and cleaning of all dirt's, raking out joints, hacking, scrubbing, chamfers, beading, curing, all lifts etc. All labour & material complete |
| 8 | Supplying and fixing woven plain G.I wire fencing (chain link fencing of 75mm (3\\") x 8 SWG mesh chain link fencing including fixing to 65 x 65 x 8mm M.S angle posts including providing 2 nos 16mm dia M.S bars at top and bottom of fencing, painting the posts and M.S bars with two coats of synthetic enamel paint over a coat of red lead primer etc. All labour & material etc. complete. |
| 9 | Supplying and fixing in position G.I. Chain link fencing 0.60m high with 75mm (3\\") x 8 SWG mesh fixed to (40x40x6)mm angle outer bracket and 25x25x5mm ms angle inner bracket including painting two coats of synthetic enamel paint over a coat of red lead primer etc. All tools, plant, labour & material etc complete. |
| 10 | Supplying & erecting in position structural steel work in single section (light sections up to 34 kg./m) incl. Cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of red oxide zinc chromite primer etc. All labour & materials tools & plant etc. complete. |
| 11 | Fixing of M.S. split Anchor bolts, 12 mm dia and 80 mm long including drilling the hole in the existing concrete up to minimum depth of 50mm & embedding into existing roof slab etc. All tools, plant, labour and material etc. complete. |
| 12 | Supply of Tree prunning / chain saw machine- 22 inch petrol operated inluding fuel and oil etc and 01 operator and 01 helper for 8 hours a day including replacement of worn out chain (used for cutting trees) on call basis etc. including cutting of logs in 1mtr size and stacking neatly in place as directed. All labour and material etc complete |
| 13 | Execution of day to day works by supply of mazdoor with tools for a period of 8 hours per day as and when required etc complete |
| 14 | Supply of mini truck/tempo on hire basid as and when required of 6.00 cum capacity in working condition for 8 hours a day along with driver, required fuels in Port area for transporting building materials, debris ..etc. as directed within a lead of 6.00 kms etc. All fuel, driver, Maintenance etc. complete. Please Enable Macros to View BoQ information |