| 1 | Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. |
| 2 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.(In Bridge Work)( Including Labour Cess And Excluding G.S.T.) |
| 3 | Plane/Reinforced Cement concrete in open foundation complete as per drawing and Technical Specifications. M15 (In Bridge Work).( Including Labour Cess And Excluding G.S.T.) |
| 4 | Sand Filling Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 .( Encluding Labour Cess And Excluding G.S.T.) |
| 5 | Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations (In Bridge Work).( Encluding Labour Cess And Excluding G.S.T.) |
| 6 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification.(In Bridge Work).( Encluding Labour Cess And Excluding G.S.T.) |
| 7 | Providing weep holes in brick massonry abutment wing walls/ return wall with 100mm dia AC pipe, extented to the full widthof the structure with slope 1V:20H.( Encluding Labour Cess And Excluding G.S.T.) |
| 8 | Furnishing and placing reintforced cement concrete in super structure as per drawing and Technical Specifications. M30 (Including Labour Cess And Excluding G.S.T.) |
| 9 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses..( Including Labour Cess And Excluding G.S.T.) |
| 10 | Drainage spouts complete as per drawing and technical specification clause as per MORT&H specification clause 2705.( Including Labour Cess And Excluding G.S.T.) |
| 11 | Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm. as per drawing and technical specifications Clause.( Including Labour Cess And Excluding G.S.T.) |
| 12 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification.( Encluding Labour Cess And Excluding G.S.T.) |
| 13 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications..( Encluding Labour Cess And Excluding G.S.T.) |
| 14 | Providing and laying boulders apron on river bed protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification..( Encluding Labour Cess And Excluding G.S.T.) |
| 15 | Construction of embankment with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5.( Encluding Labour Cess And Excluding G.S.T.) |
| 16 | Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.(Local Earth in Add App.) (Including Labour Cess And Excluding G.S.T.) |
| 17 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401..( Encluding Labour Cess And Excluding G.S.T.) |
| 18 | Providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of sub-base.(Including Labour Cess And Excluding G.S.T.) |
| 19 | Providing, laying and spreading material on prepared sub-base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to from a layer of base..( Including Labour Cess And Excluding G.S.T.) |
| 20 | Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2..( Including Labour Cess And Excluding G.S.T.) |
| 21 | Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets 1000dia Hume Pipe.( Including Labour Cess And Excluding G.S.T.) |
| 22 | PCC Grade M 15 (Substructure)Plane/Reinforced Cement concrete in open foundation complete as per drawing and Technical Specifications. M15 (in Road Work) (Including Labour Cess And Excluding G.S.T.) |
| 23 | Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/superstracutre as per technical specification clauses 613.4 & 1204.(in Road Work).( Including Labour Cess And Excluding G.S.T.) |
| 24 | Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.( Encluding Labour Cess And Excluding G.S.T.) |
| 25 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6.(in Road Work) (Including Labour Cess And Excluding G.S.T.) |
| 26 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 I In 1:3 cement mortar.(in Road Work).( Encluding Labour Cess And Excluding G.S.T.) |
| 27 | Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4(in Road Work) (Including Labour Cess And Excluding G.S.T.) |
| 28 | Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same with three wheeled road roller 80-100 kN as per Technical Specification Clause 412.( Including Labour Cess And Excluding G.S.T.) |
| 29 | As in item (360) above but 2.5 cm. (1\\") thick and of cement concrete consisting of one part cement 11/2 parts approved coarse sand and 3 parts approved 13mm (11/2) graded stone grit and including water proofing materials as ordered by the Engineer-in-charge in the proportion as specified by the manufacturers.(SOR)( Including Labour Cess And Excluding G.S.T.) |
| 30 | Laying 350 mm dia reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets( Encluding Labour Cess And Excluding G.S.T.) |
| 31 | Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.35 kg per sqm on the prepared surface cleaned with hydraulic broom .( Encluding Labour Cess And Excluding G.S.T.) |
| 32 | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat .( Encluding Labour Cess And Excluding G.S.T.) |
| 33 | Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .( Encluding Labour Cess And Excluding G.S.T.) Please Enable Macros to View BoQ information |